Working alongside the Tradition Community Development District, Public Works coordinated the installation of pumps near the C-24 outfall area, Vitalia and Del Webb Communities to assist water management efforts. In addition, a temporary six-inch pump was also installed along Crosstown Parkway to support drainage near the Verano area and was monitored throughout the weekend.
Citywide pothole repair operations were launched, with crews prioritizing public safety and roadway accessibility. Staff continues to monitor water levels throughout the City, clear drainage grates, operate stormwater control structures and address ongoing system needs. Public Works remains focused on restoring roadways, repairing infrastructure, maintaining drainage system performance and assisting residents impacted by the storm.
Roadway Resurfacing Projects www. cityofpsl. com / repaving The Capital Improvement resurfacing goal for FY 2025- 26 is 18.95 miles with 17.25 miles completed to date. The final project to take place is Hidden Oaks, Import Drive and that is scheduled for construction in early October.
The Capital Improvement resurfacing goal for FY 2026- 27 is 11.35 miles. Residents will be notified in advance of resurfacing.
Northport Village: To be scheduled Riverview: To be scheduled Northport Village( Bayshore): To be scheduled Oak Hammock( Del Rio): To be scheduled Cashmere Cove( Cameo): To be scheduled
The recent rain event demonstrated both the challenges posed by extreme weather and the importance of maintaining a strong and resilient stormwater system. Through preparation, rapid response and ongoing recovery efforts, Public Works remains committed to protecting the community and continuously enhancing the City ' s readiness for future storm events. www. CityofPSL. com / PublicWorks