PSL on the Pulse (10/03/25) Vol. 9 | Issue 10 | Page 11

Improvements to the corridor will accommodate future traffic volumes and uphold the integrity of the neighborhood. This project aims to enhance safety, improve pedestrian and bicycle movements, reduce congestion and facilitate more efficient traffic flow. Key enhancements in Floresta Drive Phase 3 include:
• New roundabouts
• Dedicated bicycle lanes
• Sidewalks
• Intersection improvements at Prima Vista Boulevard and Floresta Drive
• Stormwater treatment pond site
• Integration with the Crosstown Parkway intersection
• Installation of baffle boxes
• Improvements to the D-11 Canal
Motorists are advised to exercise caution and reduce speed while traveling through the work zone. The speed limit has been lowered to 25 mph in this area to ensure the safety of residents, motorists and workers.
Roadway Resurfacing www. cityofpsl. com / repaving The Sales Tax resurfacing goal for FY 2024-25 is 18.75 miles with 18.75 miles completed to date. Residents are notified in advance of resurfacing.
Floresta Pointe: Complete
Oak Hammock: Complete
Rosser Reserve: Complete
Rosser Reserve / Woodland Trails( Paar West): Complete
Rosser Reserve / Woodland Trails( Savona South): Complete
Southbend Lakes: Complete
Swan Park( Lakehurst): Complete
Tulip Park / Whispering Pines( Darwin): Complete www. CityofPSL. com / SalesTax
PSL
ON THE
PULSE
11