PSL on the Pulse (04/04/25) Vol. 9 | Issue 4 | Page 10

Roadway
Resurfacing www. cityofpsl. com / repaving
Improvements to the corridor will help with future traffic volumes and preserve the integrity of the neighborhood. The project will improve safety, enhance pedestrian and bicycle movements, alleviate congestion and provide more efficient traffic flow. Improvements on Floresta Drive Phase 3 include new roundabouts, dedicated bicycle lanes, sidewalks, intersection improvements at Prima Vista Boulevard and Floresta Drive, stormwater treatment pond site, integration with Crosstown Parkway intersection, installation of baffle boxes and improvements to the D-11 Canal.
Lane closures are anticipated on Floresta Drive from Crosstown Parkway to Prima Vista Boulevard. Motorists are asked to use caution and slow down while traveling in the work zone.
The Sales Tax resurfacing goal for FY 24 / 25 is 18.75 miles with 2.06 miles completed to date. Residents are notified in advance of resurfacing.
Floresta Pointe Oak Hammock Rosser Reserve
Rosser Reserve / Woodland Trails( Paar West)
Rosser Reserve / Woodland Trails( Savona South)
Southbend Lakes Swan Park( Lakehurst)
Tulip Park / Whispering Pines( Darwin) www. CityofPSL. com / SalesTax
10 ON THE
PSL PULSE