PSIE Industrial Magazine Volume 2 Issue 1 | 页面 8

July 2016 - Volume 2, Issue I SIX SIGMA GREEN BELT PROJECT By: QURRATULAIN SHAKOOR Vice Chairperson - PSIE This project was about developing a solution towards increased scrap generation for a tobacco grade (SF2RWS) due to degradation in primary conditioning cylinder in the-GLT Factory, British American Tobacco Company (BAT) . Scrap generation is one of the contributing factors in reducing the quality of the tobacco grades. The average scrap per sample was 13.5%. The critical tools used in this project were; SIPOC diagram, XY Matrix, Descriptive Study, Minitab for Process Capability, Cause and Effect diagram, hypothesis testing, Correlation/Regression analysis, DOE, and solution plan. In the DEFINE phase, after problem identification, a project charter was created and approved from the executives of the company, followed by a SIPOC diagram and Process Map to provide detailed information about the whole manufaturing process. In the MEASURE phase we studied the actual scenario of the problem and data was captured for analysis. Through descriptive study and process capability tools we made a conclusion on current scenario. Result of data was analyzed through correlation analysis and hypothesis testing in the ANALYSIS phase. It showed that the critical parameters of primary conditioning cylinder needed to be optimized and reassessed for tobacco grades which will help in reducing the roller deck scrap generation. In the IMPROVE phase solution was implemented with the help of DOE and we observed reduction in the scrap generation (an improvement of 10%) In the CONTROL phase a plan was created and shared to maintain the gains. 07