Protection Engineering Basics and Schemes Protection Engineering | Page 89
110% of nominal voltage, in second stage it will activate
when value get exceed from 110 % of nominal value.
Also one PT connection to Main-1 protection is shown
here.
in next drawing we have two PT connection drawing for
Main-1 and Main-2 Protection circuit.
pg. 89