Protection Engineering Basics and Schemes Protection Engineering | Page 51

120 0 , This PT must be ground and is place with under test PT  Connect Proven VT with your Phase rotation meter, and place A phase of phase rotation meter at A phase of under test PT, if polarity correct meter will show 0 reading or some but little amount of voltage presence say 1-2% of rated output secondary voltage. Do same with all other phases. This will not exactly detect the correct phase sequence  We also can do it by other way, we can remove B and C phase HRC fuses , and then check A phase , if phase sequence is correct then only phase show Voltage, B and C phase will show Zero or residual voltage  Remember once you connected your phase rotation meter, you just have to move your dial on particular phase voltage measurement. You can see real time connection drawing of this test below pg. 51