Protection Engineering Basics and Schemes Protection Engineering | Page 46

In cascade we take multiple PT and combine those in series and in a way in which we have multiple Primaries on opposite of each PT, at the end of each PT there is coupling winding which is connecting one PT with other PT, at the final PT in cascade we have one secondary winding, from which we take our secondary output. Let suppose we have 500KV Line on which we need to install our PT for protection and metering purpose, what we do we take 4 PTs of 132KV , and connect their primary in series and connect each PT via coupling winding with each other in series , now what happened , in series all primary voltages will be add up 132+132+132+132=528KV, we can reduce 528KV by using Tap setting on PTs Which, we now can use on 500KV line. This arrangement we set up in one hollow cylinder, which will be filled with insulated oil to maintain insulation in between the PTs pg. 46