Protection Engineering Basics and Schemes Protection Engineering | Page 35

 Multicore  Multi ratio or Dual Ratio 1.1.12.1 Multi core: This CT is CT with separate secondary windings , in which if you are using one secondary winding you need to short all other secondaries , because each core is act as separate CT, it is represented in terms of primary like 4000/2000/1. In it if you are using 4000/1 then you must have to short 2000/1 secondary contacts. pg. 35