Proposed City Bond 2018 Proposed Bond 2018 | Page 9

BOND 2018 PROPOSITION A - STREETS (Continued) Santa Fe Street was improved under the Bond 2014 program. 14. LAGUNA SHORES ROAD Caribbean Dr. to Hustlin’ Hornet Dr. $ 2,800,000 Reconstruction of existing 2-lane roadway. New roadway will be ele- vated 5 feet above mean sea level and will have a retaining wall placed where needed to protect against wave action. No curb & gutter is planned. Project will incorporate a pilot wetland mitigation plan developed with Federal grants. 15. LIPES BOULEVARD Yorktown Blvd. to Sun Wood Dr. $ 2,650,000 Reconstruction of existing 2-lane roadway with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, traffic signalization improvements, and illumination improvements. Consider- ation will be given for improvements to bike mobility per the adopted MPO bicycle mobility plan. 16. WOOLDRIDGE ROAD Everhart Rd. to Cascade Dr. $ 1,700,000 Reconstruction of existing 2-lane road- way with new pavement, ADA compli- ant curb ramps, signage, illumination, and pavement markings. 17. STRASBOURG DRIVE Riom St. to Grenoble Dr. $ 1,500,000 Reconstruction of existing 2-lane road- way with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, and illu- mination improvements. Consideration will be given for improvements to bike mobility per the adopted MPO bicycle mobility plan. 18. RESIDENTIAL STREET REBUILD PROGRAM $10,550,000 Provides funding for residential street rebuild including new pavement and limited curb & gutter, sidewalk, ADA compliant curb ramps, and signage. 19. TXDOT PARTICIPATION Traffic Congestion Management $ 1,250,000 Provides funding for the City’s local share of costs on constructing projects leveraged with Texas Department of Transportation. 20. TRAFFIC SIGNAL IMPROVEMENTS $ 1,000,000 Various Citywide traffic operation improvements, for new and improved traffic signals that include span wire traffic signal replacements, traffic signal wireless communications, and other signal hardware improvements. Project will leverage State and Federal funding. Project scopes, locations and costs are estimates based on information currently available and are, therefore, subject to reasonable change on the basis of new and refined information up to the time of completion. 9