Product Technical Guides : US-EN Direct Fastening - Volume 1 Edition 22 | Page 123

Direct Fastening Technical Guide , Edition 22
3.2.19.4 INSTALLATION INSTRUCTIONS *
Installation instructions for X-IE 6 Insulation Fasteners
1 . Load X-IE 6 on powder-actuated tool .
2 . Push the X-IE 6 all the way into the insulation . Fastener tip must touch base material .
3 . Make the fastening .
Correct : Top hat crushed
Inorrect : Top hat not crushed
Note : For convenience , use insulation corer X-IE-KC for pre-coring the hard board .
4 . Verify successful fastening . Remove if not clamped tight to insulation .
5 . Visual check immediately after fastening .
Installation instructions for X-SW Fasteners
1 . Load X-SW on powder-actuated tool . 2 . Press the X-SW against the surface . 3 . Make the fastening .
* Installation Instructions For Use ( IFU ) are included with each product package . They can also be viewed or downloaded online at www . hilti . com . Because of the possibility of changes , always verify that downloaded IFU are current when used . Proper installation is critical to achieve full performance . Training is available on request . Contact Hilti Technical Services for applications and conditions not addressed in the IFU .
123