Product Technical Guides : US-EN Cast-In Anchor Channel Fastening Technical Guide | Page 260

1. Anchor Channel Systems 2. HAC Portfolio 3. HAC Applications 4. Design Introduction 5. Base material 6. Loading One BOS and another TOS channels: BOS away from TOS Current AC232 excluded parallel anchor channels. Hilti anchor channel analysis of parallel anchor channels is based on ACI 318 provisions. The analysis of the concrete breakout strength in shear is based on ACI 318 principles in conjunction with AC232 design methodology. All steel failure modes are in accordance to ESR-3520. One can use the principles of to use ACI 318-14 provision to evaluate top and bottom. Concrete breakout strength in shear of parallel anchors is per ACI 318 concepts pertaining to dividing the concrete between the two channels. Principles of AC232 should be used while evaluating the concrete breakout capacity of all the concrete failure modes. 8. Reinforcing Bar Anchorage 9. Special Anchor Channel Design 10. Design Software Another assumption of the distribution of forces indicates that the total shear force would be critical on the rear anchor and its projected area. This provision is checked for parallel double channels in order to confirm that the total available concrete between the BOS channel and the front edge has sufficient capacity to take the total shear force experienced by both channels. 11. Best Practices 12. Instructions for Use 13. Field Fixes 14. Design Example BOTTOM OF SLAB: The perpendicular concrete breakout strength of the BOS channel should be evaluated using c a1 as the concrete edge distance of c a1,b . The BOS anchor channel should be loaded with the total shear force (V uay,a +V uay,b ) acting on both anchor channels. The height (h) used in the analysis is h as shown in Figure 9.2.14.6. Perpendicular Shear TOP OF SLAB embed: Shear forces on TOS and BOS are V uay,a and V uay,b respectively. The front edge of the ToS embed is checked against the V uay,a force. For the calculation of concrete breakout, c a1 , is taken as c a1,a . Figure 9.2.14.5—Calculation of A vc for single anchors and groups of anchors per ACI 318-14. Figure 9.2.14.6 — Parallel Channels Top and Bottom: BOS away from TOS- Perpendicular Shear BOS Section View. Figure 9.2.14.1 — Parallel Channels Top and Bottom: BOS away from TOS - Plan View. 9.2.14 — HAC AND HAC-T DESIGN: PARALLEL CHANNELS TOP AND BOTTOM 7. Anchor Channel Design Code Figure 9.2.14.3 — Parallel Channels Top and Bottom: BOS away from TOS- Perpendicular Shear TOS-Plan View. Figure 9.2.14.7 — Parallel Channels Top and Bottom: BOS away from TOS-Perpendicular Shear BOS-Plan View. Figure 9.2.14.2 — Parallel Channels Top and Bottom: BOS away from TOS - Section View. 260 Figure 9.2.14.4— Parallel Channels Top and Bottom-BOS away from TOS: Perpendicular Shear TOS-Section View. Cast-In Anchor Channel Product Guide, Edition 1 • 02/2019 261