of Kit System
Nationwide delivery
FIXED
PRI
OR KEEPING
2020
CONTROL AND OFFERING
3000 x 3000 £1,58
4000 x 3500 £2,12
OCTOBER 2019 | 13
4500 x 4000 £2,5
News
Lowest
Read online at www.proinstaller.co.uk
WarmerRoof ‘U’ Value
Victoria
0.14 W/m 2
3500 x 3000 £1,85
4500 x 4000 £2,6
5-
5000 x 5000 £3,3
Timber Flat Roof
Kit System Roof Kit System N
Pitched
CERTAINTY,
EVEN
IN
UNCERTAIN
TIMES
Double Hip
Manufactured precisely to
rdian
£1,584.30 +VAT
Dilip
£2,120.85
+VAT Choudhury, Sales Director at Warmer Roof has been involved
with
selling of requirements
Conservatory Roof Systems,
£2,534.89
+VAT the manufacturing
meet and
project
for the last 25 years; here he explains exclusively to Pro Installer,
with all timbers cut using CNC machining centre.
orian Warmer Roof and its products, the future of the sector, and how
A truly uncertain
solid roof contruction,
using
highly
insulated
– even
these
times
– he
and
his team
will be
£1,850.70
+VAT in
fitting
and
No
risk most
of
cold
Roof
samples
and
Tapco
and
structural
panels
with
no
cross
battening
required.
offering
guaranteed
certainty
when
it
comes
to
pricing,
for
2020…
£2,624.87 +VAT
Approval
bridging
showroom support
Metrotile
£3,389.31 +VAT
FIXED
our M.D,
£2,225.90
+VAT myself, Dave
Mcleod (Regional Sales
£3,159.26
+VAT and Gary Cor-
Manager
bett, the (Factory Man-
£4,275.79
+VAT
n To
e End
Gable En
3500 x 3500 £1,84
5000 x 4000 £2,6
6000 x 3000 £2,4
The Warmer Roof team
Hipped
consists of Karl Muspratt
ager), Ian Bennett (Oper-
ations Manager), Jordan
Cooper (Technical Manag-
er), Lorna (Office Manag-
£1,846.86
+VAT
er). The
factory has thirty
six factory
£2,658.61
+VAT operatives and
we employ five drivers.
£2,418.16
+VAT Roof is com-
Warmer
pletely different from most
other replacement roof
systems as it is con-
structed
£1,703.36
+VAT of timber and
we do not have any metal
£2,259.88
+VAT
components
within the
roof +VAT
structure apart from
£2,675.65
fixings. We have adopted
this ethos as problems can
ember, with
and the
have been encoun-
mer Roof tered
you get
with replacement
omponents
aluminium roof systems
condensation has
ded in the where
price
occurred through cold
bridging. Warmer Roof also
has the warmest roof on
the market with a ‘U’ value
of 0.18Wm 2 K.
We are the sole manu-
facturers of the Warmer
Roof System, and do not
have a fabricator network.
We do not have a fabrica-
tor network as it is impos-
sible to control, not only
the quality of the product,
but what actually what
goes into the product and
whether that product is
what has been passed for
Building Control.
We also have a fleet of
vehicles ranging from box
vans, 7.5 ton, 18 ton, and
articulated vehicles to de-
liver our product through-
3000 x 3500 £2,22
4000 x 4500 £3,1
5000 x 5500 £4,2
Pitched Roof
Lean To
Full
JHAI accreditation
out England
and Wales
Using our own transport
Pre-assembled
at our factory
Fast quote
gives us greater flexibility
turnaround
Convenient
and speedy
assembly
on-site
to deliver our products
on
Faster fitting and
JHAI Approval
a 5-day turnaround from
order confirmation to de-
livery piece
and in the
majority EPDM roof covering, fascia and
One
Firestone
of cases to a supplied
site address.
guttering
as standard
We prefer to deliver to
All
on
our unmarked transport direct to site
site delivered
as there is no
dou-
or
premises
ble your
handling
of product,
In terms of the future of
so we load our vehicle at
companies. We recognise
the sector, our customers
our factory in Frome and
that the customer is King
are already talking about
unload at site.
and that they should
how green our product
We are very grateful
be treated as such. We
E 380
ER all PL
M that
is, in
the AT
timber
to other replacement
insist on quotations being WAR
used is from replenishable
conservatory roof sys-
completed and returned
sources and there is not
tems having made the
to the customer within 24
the energy usage and ma-
ground-breaking changes
hours and that replace-
jor transportation prob-
to the roof market; from
ment roofs are delivered
lems bringing products
the old days of glass and
if required on a 7-day
from China and India. We
polycarbonate roofs. The
turnaround from receipt of
think that Solar Panels will
original conservatory roofs
order confirmation. We are
become part of the roof
were too cold in winter
not infallible, and should
structure and that the
and too warm in summer;
something be missed off
*
suns energy will be har-
and effectively were just
an order we will either
nessed to create energy or
greenhouses as the name
deliver the part next day
heat the home.
conservatory defines; a
if we cannot
send
out
on
www.warmerroof.com
For the company itself,
room with a glass roof and
a courier or alternative-
*Terms and conditions apply.
in the next five years we
walls, attached to a house
ly have that part send
hope to be market leaders
at one side. Now that the
by courier on a next AM
in the roof replacement
roof construction has
delivery.
market and in ten years’
better ‘U’ values the old
Since our launch in 2018
time, who knows? Maybe
conservatory becomes a
we have increased produc-
retirement (well for the
more habitable room.
tion over 400%; employing
Sales Director anyway)!
Warmer Roof also realis-
more staff and vehicles to
es that we are effectively
cope with the demand. We
For more information
new kids on the block
are continuing to grow and
please telephone
and as such do not want
look at next year as a new
01373 473900 or e-mail
to make the same mis-
challenge as we launch our
[email protected]
takes of other systems
new products.
£1,70
No risk of 4500
cold x 3000
Roof sampl
5500 x 3500
£2,25
bridging
showroom
s
6000 x 4000 £2,6
Available with or without lantern or flat glass plate
Remembe
Warmer R
all compo
included in
E us your best quote to
AVAILABL Send
OW AVAILABLE
01373 47 39 00 see what we can do for N you
to lose
WarmerRoof
s a try today! You have nothing
73 47 39 00
WILL
BEAT
ANY
QUOTE!
[email protected]
Give us a
Faster
fitting and
Call:
01373
JHAI Approval
Email: sales@
FIXED PRICES FOR 2020
Fast quote
turnaround
For 2020 and after extensive negotiations with all
our suppliers, we have now been able to guarantee
that Warmer Roof prices will remain static through-
out 2020 with no price increase being made.
E
L
B
A
L
I
A
V
A
S
Y
SURVE
00
We made the decision to start negotiating with our
suppliers some eight months ago as we realised
that consumers were unsettled with the Brexit sit-
uation and were unable to make decisions as prices
of most raw materials were set to rise and the GBP
against the USD was falling With the uncertainty
surrounding Brexit at least we can offer our existing
and new customers the certainty that the price of
a Warmer Roof on the 1st January 2020 will be the
same as that on 31st December 2020 (the conserv-
atory roof has to be the exact same style and exact
same dimensions).
Call 01373 47 39
You have
WE WILL BEAT ANY