Pro Installer March 2020 - Issue 84 | Page 6

6 | MARCH 2020 News Read online at www.proinstaller.co.uk NEW FABRICATOR PROMISES ALUMINIUM BI-FOLDS IN JUST SIX DAYS 6 Day Doors, the latest venture from Essex based construction powerhouse the Chigwell Group, promises to deliver market-leading aluminium bi-fold doors in under a week. Where most fabricators offer aluminium bi-folds with lead times of two to three weeks if not longer, the new business can provide them in just six days – and if it doesn’t, your next order is half-price. “6 Day Doors does what it says on the tin,” says Managing Director Sunny Singh. “We’re offering the industry leading Smart Visofold 1000 bi-fold in grey, white and black - and when you buy one from us, it’ll be with you in six days. The door is available in other colours of course, but on a longer lead time.” The obvious question of course is how have 6 Day Doors man- aged to commit to such a short lead time? “The truth is, there is no big secret,” Sunny explains. “Frankly, I think the industry has got used to having to wait nearly three weeks for aluminium doors, and so no-one’s felt the need to invest and speed that process up. “What we’ve done is simple. Using the resources and expertise of the wider Chigwell Group, we’ve acquired some cutting-edge machinery and manned it with some experienced and highly motivated fabricators. It’s certain- ly not easy, but it’s not hugely complex either – if you’ve got the willpower to do it, it can be done.” Sunny concludes: “If you want to benefit from the huge de- mand for quality aluminium door products without the lengthy lead times, give us a call.” 6 Day Doors is the latest addition to the Chigwell Group of companies, which includes Chigwell Construction, Chigwell Window Centre and Chigwell Heating. The company is offering other products on longer lead-times, including the Smart Visofold 6000 bi-fold and Visoglide Plus patio door. www.6daydoors.co.uk Edgetech’s Super Spacer brings sustainability to one of the world’s tallest wooden buildings Edgetech’s world- © cetus Baudevelopment + kito.at renowned Super Spacer has helped make one of the world’s tallest wooden buildings a beacon of ener- gy efficiency. HoHo Wien, located in Vienna’s 22nd district, is a modern marvel of timber and state-of-the art tech- nology. The 82-metre, 24-storey structure was the vision of architects Rudiger Lainer + Partner, and designed to offer a visually distinctive and outstandingly sustaina- ble space for hotels, restau- rants, offices, apartments and more. The building’s 1,100 triple-glazed units all in- © Thomas Lerch corporate Edgetech’s Super Spacer T-Spacer, allowing them to achieve U values of just 0.5, and helping the building save 2,800 tonnes in carbon emissions com- pared to a more conven- tional structure of the same size. The building itself is a wood-concrete hybrid con- struction. The interior con- sists of a solid reinforced concrete core containing staircases, elevators and supply shafts, and prefabri- cated solid wood structures are arranged around it. The wall and ceiling elements made of spruce wood re- main unclad to retain their natural character. Its exceptional environ- mental performance has seen the project receive two highly prestigious ac- colades – a gold LEED cer- tification, and a gold award from the Austrian Sustaina- ble Building Council. “We were delighted to be involved in such a fantastic, forward-thinking pro- ject,” comments Edgetech Managing Director Chris Alderson. “Pair Super Spacer’s ex- ceptional energy efficiency with an ingeniously-de- signed, sustainably-con- structed landmark like HoHo Wien, and you’ve got a template for the architecture of the future. We hope to work on many more developments as ground-breaking and ambi- tious as this one in years to come.” www.edgetechig.co.uk