40 | JUNE 2019
Products
Read online at www.proinstaller.co.uk
aneless
Paneless
Paneless
Paneless
installation
installation
installation
installation
Paneless
ple guide
This
This
This
will
simple
simple
simple
take guide
you
guide
guide
through
will
will
will
take
take
take
an you
you
easy-to-follow
you
through
through
through
an
an
an
easy-to-follow
process
easy-to-follow
easy-to-follow
process
process
process
This simple guide will take you through an
easy-to-follow
process
®
® ® ®
lantern
correctly.
lantern
lantern
lantern
correctly.
correctly.
correctly.
e you build
to to to
ensure
ensure
ensure
and install
you
you
you
build
build
your
build
and
and
Roof
and
install
install
install
Maker
your
your
your
Slimline
Roof
Roof
Roof
Maker
Maker
Maker
Slimline
Slimline
Slimline
to ensure you build and install your Roof Maker Slimline ® lantern correctly.
ening
size of
ntern
1 1 1
1
3
3 3 3
3
5
5 5 5
5
Pull bar towards you
whilst tightening the bolt
Pull
Pull
bar
Pull
bar
towards
bar
towards
towards
you
you
you
Pull
bar tightening
towards
you
whilst
whilst
whilst
tightening
tightening
the
the
bolt
the
bolt
bolt
whilst tightening the bolt
8
8 8 8
8
Insert glass into the
inside groove of the
packer to ensure it sits
flush onto the frame
11
Insert
Insert
Insert
glass
glass
glass
into
into
the
into
the the
inside
inside
inside
groove
groove
groove
of of
the
of
the the
Insert
glass
into
the
packer
packer
packer
to
to
ensure
to
ensure
ensure
it
sits
it
sits
it sits
inside groove of the
flush
flush
flush
onto
onto
onto
the the
the
frame
frame
packer
to
ensure
it frame
sits
flush onto the frame
INSERTING THE GLASS
INSERTING
INSERTING
INSERTING
PANELS
THE
THE
THE
GLASS
GLASS
GLASS
INTRO
PAN
PA
P
INSERTING THE GLASS PANEL
CARR
Peel back the first 5cm of
Peel
green
Peel
Peel
back
back
glazing
back
the
the
the
first
tape
first
first
5cm
5cm
5cm
of of
green
of
green
green
glaz
gla
g
Peel back the first 5cm of green glazing
covering (applied to the covering
hips
covering
covering
and ridge
(applied
(applied
(applied
bars)
to to
the
to
the
the
hips
hips
hips
and
and
and
ridg
ri
Prepare
covering (applied to the hips and ridge b
and fold it underneath the
and
and
bars
and
fold
fold
so
fold
it it underneath
it can
underneath
it underneath
be
the
the
the
bars
bars
bars
so
so
it so
c i
off
all
fo
and fold it underneath the bars so it can
reached from the inside reached
when
reached
reached
construction
from
from
from
the
the
the
inside
inside
inside
when
when
when
constr
con
co
from
th
reached from the inside when construc
is completed. Bring in one
is is
completed.
of is
completed.
the
completed.
panels
Bring
Bring
and
Bring
in in
one
in
one
one
of of
the
of
the
the
pan
p
and
gen
is completed. Bring in one of the panels
sit it on the inside groove
sit
of
sit
it
sit
the
on
it
on
it
the
packers,
on
the
the
inside
inside
inside
and
groove
groove
groove
of
of
the
of
the
the
pack
pa
p
ridge
to
sit it on the inside groove of the packers
then gently lower it into
then
the
then
then
frame.
gently
gently
gently
Repeat
lower
lower
lower
it
this
into
it
into
it
into
the
the
the
frame.
frame.
fram
R
carrier,
then gently lower it into the frame. Repe
with all four panels. with
with
with
with
all
all
four
all
four
four
panels.
panels.
panels.
centred
all
four
panels.
Internal
Internal
Internal
opening
opening
opening
Internal opening
to to
match
to
match
match
the the
size
the
size
of
size
of of
to match the size of
your
your
your
roof
roof
roof
lantern
lantern
lantern
your roof lantern
HE TIMBER
PREPARE
PREPARE
PREPARE
KERB THE
THE
THE
TIMBER
TIMBER
TIMBER
FIXING
KERB
KERB
KERB
YOUR UPSTAND
FIXING
FIXING
FIXING
TO
YOUR
YOUR
THE
YOUR
UPSTAND
UPSTAND
UPSTAND
FIXING
TO
TO
TO
THE
THE
THE HIP BODIES
FIXING
FIXING
FIXING
THE
THE
THE
HIP
HIP
HIP
BODIES
BODIES
BODIES
PREPARE
THE
TIMBER
KERB
FIXING
YOUR
UPSTAND
TO
THE
FIXING
THE
HIP
BODIES
TIMBER
KERB
TIMBER
TIMBER
TIMBER
KERB
KERB
KERB
TIMBER
KERB
gin the construction
Before
Before
Before
you
you
you
begin
of begin
your
begin
the
the
the
construction
construction
construction
of of
your
of
your
your
Take one of the hip bars Take
and
Take
Take
one
slot
one
one
of
it of
over
the
of
the
the
hip
hip
hip
bars
bars
bars
and
and
and
slot
slot
slot
it it
over
it
over
over
Before you begin the construction of your
Take one of the hip bars and slot it over
rn, you will
new
new
have
new
roof
roof
installed
roof
lantern,
lantern,
lantern,
the
you
you
you
will
will
will
have
have
have
installed
installed
installed
the
the of silicone
the
nut
and
bolt
located the
at
the
the
nut
the
nut
nut
and
corner
and
and
bolt
bolt
of
bolt
located
the
located
located
at at
the
at
the
the
corner
corner
corner
of of
the
of
the
the
Apply
a
thick the
bead
Apply
Apply
Apply
a all thick
a around
thick
a thick
bead
bead
bead
the
of of
of
silicone
of
silicone
silicone
all
all
around
all
around
around
the
the
the
new
roof
lantern,
you
will
have
installed
the
the
nut
and
bolt
located
at
the
corner
of
the
Apply
a
thick
bead
silicone
all
around
the
he size of timber
the
timber
timber
internal
kerb.
kerb.
kerb.
The
opening
The
The
size
size
size
of
of
the
of
the
the
internal
internal
internal
opening
opening
opening
upstand.
Now
pull
the
hip
upstand.
upstand.
body
upstand.
toward
Now
Now
Now
pull
pull
you
pull
the
the
the
hip
hip
hip
body
body
body
toward
toward
toward
you
you
you
timber
kerb
about
20mm
timber
timber
from
timber
kerb
the
kerb
kerb
internal
about
about
about
20mm
20mm
20mm
from
from
from
the
the
the
internal
internal
internal
timber kerb. The size of the internal opening
upstand.
hip body toward you
about 20mm from the internal
the exact should
size
should
should
of reflect
the
reflect
reflect
roof
the
lantern
the
the
exact
exact
exact
size
size
size
of of
the
the
the
roof
roof
roof
lantern
lantern
lantern
whilst
tightening
the bolt.
whilst
whilst
This
whilst
tightening
will
tightening
tightening
ensure
the
the
bolt.
bolt.
bolt.
This
This
This
will
will
will
ensure
ensure
ensure
edge.
Only
use
a professional
edge.
edge.
edge.
Only
quality
Only
use
use
silicone
use
a a professional
a professional
professional
a professional
quality
quality
quality
silicone
silicone
silicone
should
reflect
the
exact
size
of of
the
roof
lantern
whilst
tightening
the
bolt.
This
will
ensure
Only
use
quality
silicone
red. For example,
you
you
you
have
have
have
the
ordered.
ordered.
roof
ordered.
For
For
For
example,
example,
example,
the
the
the
roof
roof
roof such as
that
the
internal
nut stays
that
that
in that
the
place
the
the
internal
internal
whilst
internal
nut
nut
nut
stays
stays
stays
in in
place
in
place
place
whilst
whilst
whilst
adhesive
sealant
adhesive
adhesive
Dow
adhesive
Corning
sealant
sealant
sealant
791.
such
such
such
as as
as
Dow
as
Dow
Dow
Corning
Corning
Corning
791.
791.
791.
you
have
ordered.
For
example,
the
roof
that
the
internal
stays
in
place
whilst
sealant
such
Dow
Corning
791.
d measure
opening
exactly
opening
opening
should
2m
should
should
x 1m
measure
measure
measure
exactly
exactly
exactly
2m
2m
2m
x 1m
x x 1m
x 1m
1m
tightening. Repeat for all
tightening.
tightening.
four
tightening.
corners.
Repeat
Repeat
Repeat
all
for
all
four
all
four
four
corners.
corners.
corners.
opening
should
measure
exactly
2m
tightening.
for for
all
four
corners.
a unit
that
measures
2m
measures for
2m
for
a for
x unit
a 1m.
a unit
unit
that
that
that
measures
measures
measures
2m
2m
2m
x 1m.
x x 1m.
x 1m.
1m.
Your
timber
kerb
should
measure
70mm
rb should Your
measure
Your
Your
timber
timber
timber
70mm
kerb
kerb
kerb
should
should
should
measure
measure
measure
70mm
70mm
70mm
in width,
width,
to
match
the
width
of
the
built-in
atch the width
in in
width,
of
width,
the
to to
match
built-in
to
match
match
the
the
the
width
width
width
of of
the
of
the
the
built-in
built-in
built-in
upstand
that
you
are
going
to
assemble.
ou are going
upstand
upstand
upstand
to assemble.
that
that
that
you
you
you
are
are
are
going
going
going
to to
assemble.
to
assemble.
assemble.
4 height
We
recommend
height
of
25mm
nd a minimum
We
We
We
recommend
height
recommend
recommend
of 25mm
a minimum
a a minimum
a minimum
minimum
height
height
of of
25mm
of
25mm
25mm
from
roof
level,
but
this
can
be
increased
l, but this from
can
from
from
be
roof
roof
increased
roof
level,
level,
level,
but
but
but
this
this
this
can
can
can
be be
increased
be
increased
increased
required.
if required.
if if if
required.
required.
4 4 4
6
9
9 9 9 9
Run silicone full
length on both
sides of ridge bar
100mm silicone required
on hip bars at both top
and bottom ends
6 6 6 6
12
Ru s
Run Run
silic
length
leng
le o
sides
of
sides
sid r s
100mm
silicone
required
100mm
100mm
100mm
silicone
silicone
silicone
required
required
required
on on
hip
bars
at
both
top
on
hip
on
hip
bars
hip
bars
bars
at at
both
at
both
both
top top
top
and
bottom
ends
and
and
bottom
and
bottom
bottom
ends
ends
ends
APPLYING
SILICONE
APPLYING SILICONE
APPLYING
APPLYING
APPLYING
SILICONE
SILICONE
SILICONE
POSIT
The
upstand
should
be
perfectly
level
and
we
The
The
upstand
upstand
upstand
should
should
should
be be
perfectly
be
perfectly
perfectly
level
level
level
and
and
and
we
we
we
hould be The
perfectly
level
and
we
also
recommend
that
you
check
the
corners
also
also
also
recommend
recommend
recommend
that
that
that
you
you
you
check
check
check
the
the
the
corners
corners
corners
nd that you
check
the corners
have
angle,
by
measuring
it it
corner
to to
have
have
have
a 90°
a a it 90°
a 90°
90°
angle,
angle,
angle,
by by
measuring
by
measuring
measuring
it it
corner
corner
corner
to to
gle, by measuring
corner
to
corner
before
starting
the
assembly
of
the
corner
corner
corner
before
before
before
starting
starting
the
the
the
assembly
assembly
assembly
of of
the
of
the
the
starting the
assembly
of starting
the
roof
lantern.
roof
roof
roof
lantern.
lantern.
lantern.
2
2 2 2
You now need to secure the upstand to
FIXING THE RIDGE BODY
You now need to secure You
the
You
You
now
upstand
now
now
need
need
need
to to to
secure
to
secure
secure
the
the
the
upstand
upstand
upstand
to THE
to to RIDGE FIXING
BODY
FIXING
FIXING
THE
THE
THE
RIDGE
RIDGE
RIDGE
BODY
BODY
BODY
the timber kerb by inserting FIXING
screws into
the
The ridge body has blocks located at either
the timber kerb by inserting
the
the
the
timber
screws
timber
timber
kerb
into
kerb
kerb
the
by by
inserting
by
inserting
inserting
screws
screws
screws
into
into
into
the
the
the
The ridge
has blocks
The
The
located
The
ridge
ridge
ridge
body
at
body
either
body
has
has
has
blocks
blocks
blocks
located
located
located
at at
either
at
either
either
purpose made groove as shown,
about body
100mm
purpose made groove as purpose
shown,
purpose
purpose
made
about
made
made
groove
100mm
groove
groove
as as
shown,
as
shown,
shown,
about
about
about
100mm
100mm
100mm end which already house the bolts that will
which
end
end
the
end
which
bolts
which
which
already
that
already
already
will house
house
house
the
the
the
bolts
bolts
bolts
that
that
that
will
will
will
from each corner, screwing end
through
the already house
connect to your hip bars. Slide the slotted end
from each corner, screwing
from
from
from
through
each
each
each
corner,
the
corner,
corner,
screwing
screwing
screwing
through
through
through
the
the
the
upstand into the timber underneath.
will hip bars.
connect You
to your
connect
connect
Slide
connect
the
to
to
slotted
your
to
your
your
hip
hip
end
hip
bars.
bars.
bars.
Slide
Slide
Slide
the
the
the
slotted
slotted
slotted
end
end
of the hip bars over the bolts in the ridge end end
upstand into the timber underneath.
upstand
upstand
upstand
into
into
You
the
the
the
timber
will
timber
timber
underneath.
underneath.
underneath.
You
You
You
will
will
will
need
to into
pre-drill
your
holes
into
the
aluminium
of
the
hip
bars over the of
bolts
of
the
of
the
in
the
hip
the
hip
hip
bars
ridge
bars
bars
over
over
end
over
the
the
the
bolts
bolts
bolts
in
in
the
in
the
the
ridge
ridge
ridge
end
end
end
need to pre-drill your holes
need
need
need
into
to to
the
pre-drill
to
pre-drill
pre-drill
aluminium
your
your
your
holes
holes
holes
into
into
into
the
the
the
aluminium
aluminium
aluminium block. Position the hip bars so they connect
frame
using
a standard
metal
drill
bit.
block.
Position the hip bars
block.
block.
block.
so each
Position
they
Position
Position
connect
the
the
hip
hip
hip
bars
bars
bars
so so
they
so
they
they
connect
connect
with
other
in the
line
with
the
centre
of connect
the
frame using a standard metal
frame
frame
frame
drill
using
using
bit.
using
a standard
a standard
a standard
metal
metal
metal
drill
drill
drill
bit.
bit.
bit.
with each other in line with
with
with
with
the
each
each
centre
each
other
other
other
of in the
in
line
in
line
line
with
with
with
the
the
the
centre
centre
centre
of of
the
of
the
the
ridge
bar
as
shown.
Tighten
the
bolts,
then
Once the corners have been fixed, repeat this
ridge
bar
as
shown.
Tighten
ridge
ridge
ridge
the
bar
bar
bolts,
bar
as
as
shown.
as
shown.
then
shown.
Tighten
Tighten
Tighten
the
the
the
bolts,
bolts,
bolts,
then
then
then
Once the corners have been
Once
Once
Once
fixed,
the
the
the
corners
repeat
corners
corners
this
have
have
have
been
been
been
fixed,
fixed,
fixed,
repeat
repeat
repeat
this
this
this
repeat
at
the
other
end.
in the centre of the upstand on all four sides of
repeat
at
the
other
end. repeat
repeat
repeat
at at
the
at
the
the
other
other
other
end.
end.
end.
in the centre of the upstand
in in
the
in
on
the
the
centre
all
centre
centre
four of sides
of
the
of
the
the
upstand
of upstand
upstand
on
on
all
on
all
four
all
four
four
sides
sides
sides
of of of
the
lantern.
Check that where the hip bars meet, they line
the lantern.
the
the
the
lantern.
lantern.
lantern.
Check that where the hip
Check
Check
bars
Check
that
meet,
that
that
where
where
they
where
the
line
the
the
hip
hip
hip
bars
bars
bars
meet,
meet,
meet,
they
they
they
line
line
line
up
well
and
are
centred
on
the
ridge
bar.
UPSTAND ASSEMBLY
up well and are centred up
on
up
well
up
the
well
well
and
ridge
and
and
are
bar.
are
are
centred
centred
centred
on on
the
on
the
the
ridge
ridge
ridge
bar.
bar.
bar.
Run
silicone
into
the
deep
channels
in
Run silicone into the deep
Run
Run
channels
Run
silicone
silicone
silicone
into
in into
the
into
the
the
the
deep
deep
deep
channels
chann
chan
You
can
centre
of
the
hip
bars,
100mm
from
b f
centre of the hip bars, 100mm
centre
centre
centre
of
from
of
the
of
the
both
the
hip
hip
hip
bars,
bars,
bars,
100mm
100mm
100mm
from
fro
position
ends,
filling
it
generously.
Next
run
sili
ends, filling it generously.
ends,
ends,
Next
ends,
filling
filling
run
filling
it
silicone
it
generously.
it
generously.
generously.
Next
Next
Next
run
ru r
centre,
between all the glass panels and frame
between all the glass panels
between
between
between
and all
frames,
all
the
all
the
the
glass
glass
glass
panels
panels
panels
and
and
and
fra f
You
mu
on either side of the hip and ridge bar
on either side of the hip on
and
on
either
on
either
ridge
either
side
bars.
side
side
of of
the
of
the
the
hip
hip
hip
and
and
and
ridge
ridge
rid b
the
ridg
Only 100mm of silicone is required ru
Only 100mm of silicone Only
is Only
required
Only
100mm
100mm
100mm
running
of of
silicone
of
silicone
silicone
is is
required
is
require
requ si
other
from each end of the hip bars. For the
from each end of the hip
from
from
bars.
from
each
each
For
each
end
the
end
end
of
ridge
of
the
of
the
the
hip
hip
hip
bars.
bars.
bars.
For
Fo F t
bar, run silicone the full length on bot
bar, run silicone the full bar,
length
bar,
bar,
run
run
on
run
silicone
silicone
both
silicone
sides.
the
the
the
full
full
full
length
length
length
on on
b o
10
10
10
10
10
13
ASSEMBLY
UPSTAND
UPSTAND
UPSTAND
ASSEMBLY
ASSEMBLY
ASSEMBLY
Take two of the corner cleats and insert
e corner Take
cleats
Take
Take
two
and
two
two
of insert
of
the
of
the
the
corner
corner
corner
cleats
cleats
and
and
and
insert
insert
them
into
the
slots
in cleats
the
frame
as insert
shown.
slots in the
them
them
frame
them
into
into
as
into
the
shown.
the
the
slots
slots
slots
in in
the
in
the
the
frame
frame
frame
as
as
shown.
as
shown.
shown.
Then
take
the
corresponding
section
of
corresponding
Then
Then
Then
take
section
take
take
the
the
the
of
corresponding
corresponding
corresponding
section
section
of of
upstand
and
before
slotting section
the
two of pieces
together,
place
the
provided
and
bolt
into
efore slotting
upstand
upstand
upstand
the and
two
and
and
before
pieces
before
before
slotting
slotting
slotting
the
the
the
two
two
two
pieces
pieces
pieces
7 nut
the
prepared
hole,
which
will
be
held
in bolt
place
e the provided
together,
together,
together,
nut
and
place
place
place
bolt
the
the
into
the
provided
provided
provided
nut
nut
nut
and
and
and
bolt
bolt
into
into
into
when
the
pieces
are
joined.
hole, which
the
the
will
the
prepared
prepared
be
prepared
held two
hole,
in hole,
place
hole,
which
which
which
will
will
will
be be
held
be
held
held
in in
place
in
place
place
pieces are
when
when
joined.
when
the
the
the
two
two
two
pieces
pieces
pieces
are
are
are
joined.
joined.
joined.
Lastly, through the four preformed holes on
the
top
and
bottom
of
the
upstand,
use
the
h the four Lastly,
preformed
Lastly,
Lastly,
through
through
through
holes
the
the
on
the
four
four
four
preformed
preformed
preformed
holes
holes
holes
on
on on
provided
self-tapping
screws
to fix use
the
two
ottom of the
the
the
the
upstand,
top
top
top
and
and
and
bottom
use
bottom
bottom
the of of
the
of
the
the
upstand,
upstand,
upstand,
use
use
the
the
the
sections
of
upstand
together.
Repeat
this
for
tapping screws
provided
provided
provided
to fix
self-tapping
self-tapping
the
self-tapping
two screws
screws
screws
to to
fix
to
fix
the
fix
the
the
two
two
two
all
four
corners.
stand together.
sections
sections
sections
Repeat
of of
upstand
of
upstand
this
upstand
for together.
together.
together.
Repeat
Repeat
Repeat
this
this
this
for for for
s.
all all
four
all
four
four
corners.
corners.
corners.
7
7 7 7
POSITIONING YOUR
GLAZING
PACKERS
POSITIONING YOUR
POSITIONING
POSITIONING
POSITIONING
YOUR
YOUR
YOUR
GLAZING PACKERS GLAZING
GLAZING
GLAZING
PACKERS
PACKERS
PACKERS
Fit the packers at each corner of the
upstand,
into
the
groove
as corner
shown.
Fit the packers at each corner
Fit
Fit
the
Fit
the
the
packers
of packers
the
packers
at at
each
at
each
each
corner
corner
of of
the
of
the
the
Apply
a
small
spot
of
silicone
either
side
upstand, into the groove
upstand,
upstand,
as upstand,
shown.
into
into
into
the
the
the
groove
groove
groove
as as
shown.
as
shown.
shown.
of Apply
the
packer
to spot
stop
them
from
sliding
Apply a small spot of silicone
Apply
Apply
a either
small
a small
a small
side
spot
spot
of of
silicone
of
silicone
silicone
either
either
either
side
side
side
side
to the
side.
of the packer to stop them
of
of
the
of
from
the
packer
packer
sliding
packer
to to
stop
to
stop
stop
them
them
them
from
from
from
sliding
sliding
sliding
side to side.
side
side
side
to to
side.
to
side.
side.
INTRODUCING THE HIP CARR
AND
HIP CARRIERS
TOP CAPS
INTRODUCING THE
INTRODUCING
INTRODUCING
HIP
INTRODUCING
THE
THE
THE
HIP
FITTIN
HIP
HIP
CA
C
AND HIP TOP CAPS
AND
AND
AND
HIP
HIP
HIP
TOP
TOP
TOP
CAPS
CAPS
CAPS
END
Stagger the hip top cap 100mm with C
t
plastic
hip the
carrier
from
the
top,
Stagger the hip top cap
Stagger
100mm
Stagger
Stagger
with
the
the
hip
hip
the
hip
top
top
top
cap
cap
cap
100mm
100mm
100mm
If which
there
wit
w
part
with
the
angled
cut
out.
Gent
plastic hip carrier from the
the
plastic
plastic
plastic
top,
hip
which
hip
hip
carrier
carrier
carrier
will from
be
from
from
the
the
the
top,
at top,
the
top,
whi
w b
the
hip
carriers
and
top
caps
onto
the
the part with the angled
the
cut
the
the
part
out.
part
part
with
Gently
with
with
the
the
tap
the
angled
angled
angled
cut
cut
with
cut
out.
out.
out
a Ge
h G
bars
with
a carriers
rubber
mallet.
the hip carriers and top
the
caps
the
the
hip
hip
onto
hip
carriers
carriers
the hip
and
and
and
top
top
top
caps
caps
caps
a onto
low
onto
on
g t
bars with a rubber mallet.
bars
bars
bars
with
with
with
a rubber
a rubber
a rubber
mallet.
mallet.
mallet.
being c
Repeat