23
PRO INSTALLER JULY 2016
TOP TIPS UNLEASHED
@proinstaller1
STEP-BY-STEP
SKYLIGHT
INSTALLATION
Since 2004, Sunsquare has been pioneering skylight designs,
always aiming for the highest possible specification.
STEP ONE
As the first and only flat roof skylight
manufacturer in the world to have
its entire skylight range Kitemarked,
it comes as no surprise that they
have paid close attention its skylight
installation process too.
Sunsquare has, since it started 12 years
ago, sold separate upstands. It is the only
company to have done so and that per-
sistence is now being recognised and will
become an industry standard.
A separate upstand not only ensures the
expensive roofing membrane stays intact,
but also ensures the roofer and skylight
manufacturer can offer a comprehensive
warranty.
Here is a step-by-step guide to installation:
Check the pre-installed upstand dimensions prior to lifting the skylight
onto the roof area.
It is important to confirm that the upstand is square. This is achieved
by comparing measurements taken across the diagonally opposite
corners. If the upstand is square these dimensions will be the same.
STEP TWO
STEP THREE
STEP FOUR
Make sure that the top face of the upstand
is clean, dry and free from undulations.
Apply the skylight bedding tape (supplied) to
the full perimeter of the upstand, along the
outer edge.
Carefully lower the SkyView skylight onto
the upstand, being careful not to trap your
fingers between the upstand and skylight
frame.
Carefully adjust the position of the skylight
making sure it is correctly centred over the
aperture.
Press the tape down firmly with your fingers
to confirm full adhesion.
Check that the skylight is sitting soundly
onto the upstand, the frame should be
continuously supported on all sides.
Before moving onto the next step it is
advisable to check the positioning of the
skylight from the inside, as this will allow for
easy fixing of the internal finishes.
TOP
STEP FIVE
STEP SIX
STEP SEVEN
Using the supplied screws
fasten the skylight to the
upstand through the pre-drilled
holes.
Install the screw cover trims by
first locating the bottom edge,
then rotate the trim upwards.
To ensure the screw cover
trims are firmly located it is
advisable to lightly tap the
profile along its length with a
soft faced mallet. By doing so
you can be sure that the profile
is fully engaged.
Be careful not to over-tighten
these screws as you risk
deforming the aluminium frame.
Correct installation will be
achieved when you hear the
trim “snap” into position.
As each section is installed
check alignment at the corners,
making small adjustments with
a soft faced mallet as required.
STEP EIGHT
This completes the installation
of the Sunsquare SkyView
skylight. You are now able to
remove all protective films for
disposal.
Thoroughly clean the newly
installed skylight using a
proprietary glass cleaner and a
soft lint free cloth.
www.sunsquare.co.uk