POLOPPOSTO MANUAL USE DEUTSCHE ENGLISH | Page 30

30 DEMO FOR THE INSTALLATION OF POLOPPOSTO DEVICE 1. Take the 1:10 scale map of the ground or underground floor affected by rising damp (each centimetre on the map corresponds to 100 centimetres in reality) If a scale map is not available, we suggest you draw one, considering that each metre of wall corresponds to 1 centimetre on the map. Place the sticker (acetate sheet with a yellow-coloured ellipse on it) of the Polopposto device range on a wall drawn on the map, considering that the hole in the middle is the device location and bearing in mind that the range of Polopposto is a 14 mt long and 10 mt wide ellipse (see FIG. 1). For proper functioning, always place the device horizontally, never vertically. 2. Find the proper location of the device(s) in order for the range to cover all the walls to be dehumidified (see FIG. 2 and FIG. 3 ). 3. Now install the device. 31 Once the treatment has been applied, proceed as follows: • paint interior walls with limewash or silicate paint; • protect external walls with silicate mineral or siloxane paint; • place baseboard, if any, using silicone or proper glue: do not use metal nails because they are not compatible with masonry materials for rehabilitation purposes. • For finishes or absorbing paints, in case of water- exposed facades, it is advisable to treat the surface with nanotechnology-based, fully-breathable, transparent and non “film-forming” protective coatings.