PROJECT 19
Supplied by Greenfields Plumbing Design
The wheel-chair accessible showers.
The communal bathrooms.
Supplied by Greenfields Plumbing Design
Product Supplier Details Waste reticulation
50 – 160mm HDPE system
Water Reticulation |
Geberit |
Mepla Multilayer pipe system 16 – 75mm |
|
|
diameter |
Sanitaryware |
Lecico |
Atlas wall hung basins, with Atlas dual flush |
|
|
close coupled WC suites |
Brassware Plumline Lyra basin, shower and sink mixers Sunridge Borras Demorar Demand pillar taps STD #
BMMTP2 Stainless Steel Franke Projectline sinks and drip sinks
Heat Pumps |
Greenbro |
Six: 63kW RBG-630E / SN2-M air to water |
|
|
heat pumps |
Boilers |
Greenbro |
Six: 5 000l SA BOILER OPTIMA horizontal |
|
|
hot water storage cylinders |
Booster Pump |
WCP( Western Cape Pumps) |
( WCP 2 CR20 – 06) – 12.5l / s @ 6 Bar |
|
|
pump set |
Water Storage Roto Three: 5 500l Roto water storage tanks
Client Project Manager and Principal Agent Architect Green Consultant Quantity Surveyor Structural and Civil Engineer Mechanical, Electrical, WET Services and Fire Engineers Contractor Plumbing Contractor
Adowa Property Developers Threshold Project Managers( Pty) Ltd SVA International( Pty) Ltd Solid Green Rider Levett Bucknail( ZA)( Pty) Ltd Richard Ramplin Consulting( Pty) Ltd Richard Ramplin Consulting( Pty) Ltd Washrika 3 Oaks( Pty) Ltd Greenfields Plumbing Design