22
PROJECT
Efficient water management for The One
All images by Modular Plumbing Solutions
The One residence in Stellenbosch
By
Bernard Bronkhorst, Modular Plumbing Solutions, Cape regional manager, and edited by Tanya Olckers
Modular Plumbing Solutions, Cape recently undertook a project in Stellenbosch, The One, to install several water management systems.
We know that efficient resource management is of exceptional importance, particularly in South Africa. This particular project was one that took innovative engineering and collaborative execution. The One residence in Stellenbosch was looking to manage their water, starting the project early in November 2023. The project took just over a year to complete, finishing mid-December in 2024.
The project involved an extensive supply and installation of various water management systems, including HDPE drainage and stormwater management, MLP water supply, cold water backup storage, and a state-of-the-art hot water generation plant.
The brief for this ambitious project encompassed a comprehensive range of installations designed to enhance water management efficiency. Key components included:
• Valsir HDPE drainage systems
• Valsir MLP water supply systems
• Jojo water tanks for backup storage
• Hot water generation plant featuring Sirac modular heat pumps and Wilo pump sets
The project ' s scope necessitated meticulous planning and execution, particularly considering the tight timelines and space constraints. One of the most significant challenges encountered during the installation was the sheer volume of units required to be completed within a short timeframe. The project demanded a rapid turnaround, which necessitated strategic planning and coordination among various teams.
Another notable obstacle was the placement of hot water equipment in a particularly tight plant room footprint. The engineering team had to navigate these constraints while ensuring optimal functionality and accessibility of the equipment.
Piping systems.
The installation process was marked by innovation and efficiency. Recognising the scale and time-sensitive nature of the project, the team opted for prefabricated HDPE cast-in drainage