Booster pumps .
“ In most instances the pipes had to share routes with many other services such as electrical , data and HVAC ,” says Strydom .
There were constant developments to internal layouts , even during the late construction phases . This meant that equipment selected and installed would need to be optimised in the limits that existed so that the changes could be made .
Because the hotel was located on a sloping site , design workshops with the architects were held so that effective pipework routes to be mapped out . It was crucial to get this right in the early stages of design .
“ The entire building – including the wet services – was placed into a 3D model , which was an accurate and true reflection of the final outcome ,” says Strydom , “ This greatly assisted with the co-ordination of all the services that had to share routes to the various parts of the building . It also identified potential clashes of services that could have a design and cost implication .”
Supplied by Hazendal Hotel
The entire construction process took 18 months to complete . This included providing and installing energy efficient heat pumps that had high co-efficient of performance and an environmentally friendly refrigerant . To this end , no conventional geysers with electrical elements were used .
Now , the Hazendal Luxury Boutique Hotel stands complete , with exceptional water systems and drainage , providing a much-needed retreat in the scenic setting of Stellenbosch .