HEALTH AND SAFETY 27

This is why we need safety

By
Chris Coetzee, OHSS consultant
Plumbers have often asked,“ Why do we need safety on this site?” Generally it’ s when I am at a residential building doing inspections and ask for their safety documentation. In fact, many go on to say,“ This is not a construction site, safety is not needed here.”
What do you think, does it really matter where you are or what scope of plumbing you are doing that determines whether safety is relevant or necessary? Let us look at a few scenarios and then you can make the decision for yourself.
We will start off with a particular scope of plumbing in a residential setting and then add-in what is necessary from a safety aspect on a construction site for the same scope of work. You can then conclude if the residential plumbing needs less, the same or more safety.
Image by senivpetro on Freepik
A client calls you out to install a new geyser. They state the old one is not working and would prefer a new one. Its located in the ceiling but they have never been up there and so they do not know what to expect. We have discussed hazards in ceilings before with the main hazard being working at a height and the risk of falling to a lower level.
For construction sites, the requirement would be to ensure safe access to heights where work would be carried out. There are procedures in place for this specific work area, and we know not every ceiling is the same. There is also a need to ensure your staff are both competent to work at heights and fit to perform the work. Within this requirement are specific regulations and documents that will be needed, but let’ s look again at the goal of what the regulations are trying to achieve. Firstly, it sets a standard that any work at height must be planned so that it can be determined if the work is necessary and also if there can be a limit on how much time is spent in this dangerous situation. It then goes on to regulate who is allowed to work at heights, what the proper procedure is to follow, and outlines the correct fall prevention or protection measures along with emergency rescue procedures in case of an emergency.
Gleaning from these requirements, we could ask the question now:“ Do you see the need for safety when working inside a ceiling? How would you safely access the ceiling so as not to fall to the floor? How would you protect yourself from the hazards within the ceiling?”
Clearly, we can take a note from the regulations and have proper planning done and then create a procedure that allows us to consider the before, during and after actions of all work at heights.
Now ask yourself this question, what if something goes wrong, as it has on many occasions as we read in news articles, and someone gets hurt? How would you prove that you did everything in your
Anything could happen to you on site.
power to protect yourself or your employees. Further to this, how did you protect the people near you, whether it be the householder or someone else.
Let us drive the point home with another scenario, one that I had the experience of being an eyewitness to. A client asked for a leak to be inspected in their private yard. The services ran through the driveway and the paving needed to be lifted and ground excavated to check the piping. After digging down, the excavation eventually started to go lower than 1.5m.
At this point you are saying to yourself,“ Well, this is now falling into a construction type work and so safety is needed”.
On a construction site, the depth of excavation is often a set scenario as all work below 1.5m has specific requirements much like working at heights above, and yes, even the excavation becomes a fall risk and thus working at height requirements is then implemented as a protection. But on construction sites, the teams are led by safety professionals who will take into consideration the area around the excavated ground, the work to be performed and also the potential hazards created by the work- not just the depth of excavated ground. Therefore, it may be that even a 1m excavation is treated just as seriously as one that meets the 1.5m requirement.
Coming back to our plumbing company in our second scenario, you may think that they would now need to reevaluate the work since more time and money would need to be spent. However, even prior
June 2025 Volume 31 I Number 04 www. plumbingafrica. co. za