Plumbing Africa November 2018 | Page 67

PROJECT 65 << Continued from page 63 1 2 3 1. Circulation pumps. 2. Controls for the new effluent plant. performs overall monitoring and control of all systems as well as energy. Sensors are installed in all systems in the base and include temperature sensors, pressure sensors, air and water flow sensors, and CO 2 and O 2 sensors. All critical parameters of all systems can be monitored from the radio room in Block A. There is also a satellite link to the DEA (and soon DPW) offices in Cape Town. This link will enable DPW to monitor the systems and to provide assistance to the year team as required. FINISHING UP The refurbishment project will be concluded during the 2018/2019 season. This project is a fine example of the work undertaken and successfully concluded by DPW, their consultant Royal HaskoningDHV, and the contractor Nolitha. The final product will ensure the successful operation of the base for the next 20 years. PA www.plumbingafrica.co.za 3. The newly completed showers. LIST OF PROFESSIONALS Owner / client   Department of Public Works End user Department of Environmental Affairs Developer Department of Public Works Project manager   Department of Public Works Consulting engineers  Electrical, mechanical, wet services, structural, and civil Contractors  Main building, HVAC&R, wet services, and electrical Nolitha Gensets CAT Effluent plant Martin Membrane Systems Vacuum drainage system Jets Snow smelter TFD Pumps Wilo Controls CAS BMS Johnson Controls Product suppliers          Royal HaskoningDHV November 2018 Volume 24 I Number 9