34
Project
<< Continued from page 33
The Estuaries Plaza
building uses
approximately
zero potable water
from the municipal
supply under
normal design
building demand,
and the overall
discharge to the
municipal sewer is
drastically reduced.
Contractors
Suppliers
HVAC&R
Peninsulair
Wet services
Grinstead Plumbing
• WC and urinals: Geberit
• Taps: Newform
• Showerheads: Bossini
• Motors: Grundfos (Lenntech)
• Submersible pump: Leaders Pumps
• Bio-digesters for treatment of all waste water from the building:
Agama Energy
• Biogas burner to use biogas form the bio-digesters: Agama Energy
• Pre-filtration by means of strainers: Malutsa
• Pre-filtration by means of cartridge filters: Malutsa
• Reverse osmosis purifier: Malutsa
• Chemical dosing plant: Malutsa
• Electronic water meters: Grinstead Plumbing
• Remote monitoring system: GSM Commander, installed by Western
Cape IT Solutions
• Buffer tanks: Jo-Jo, installed by Grinstead Plumbing
• Booster pump for water reticulation into the building: Supplied by
Lowara, installed by Grinstead
• SOG trickle filter added later: HWT Water Treatment. PA