Plumbing Africa May 2017 | Page 36

34 Project << Continued from page 33 The Estuaries Plaza building uses approximately zero potable water from the municipal supply under normal design building demand, and the overall discharge to the municipal sewer is drastically reduced. Contractors Suppliers HVAC&R Peninsulair Wet services Grinstead Plumbing • WC and urinals: Geberit • Taps: Newform • Showerheads: Bossini • Motors: Grundfos (Lenntech) • Submersible pump: Leaders Pumps • Bio-digesters for treatment of all waste water from the building: Agama Energy • Biogas burner to use biogas form the bio-digesters: Agama Energy • Pre-filtration by means of strainers: Malutsa • Pre-filtration by means of cartridge filters: Malutsa • Reverse osmosis purifier: Malutsa • Chemical dosing plant: Malutsa • Electronic water meters: Grinstead Plumbing • Remote monitoring system: GSM Commander, installed by Western Cape IT Solutions • Buffer tanks: Jo-Jo, installed by Grinstead Plumbing • Booster pump for water reticulation into the building: Supplied by Lowara, installed by Grinstead • SOG trickle filter added later: HWT Water Treatment. PA