PROJECT << Continued from page 39 PROJECT CHALLENGES A particular challenge of the project was the reticulation from the lower floors to the upper floors without impacting too much on the 4th floor Telkom servitude. The servitude on these floors exists as it forms part of the Telkom data centre infrastructure, which had to be worked around. Another major challenge was the old steel sewer system that was essentially dilapidated, and which is also approximately seven meters below ground, so it was not just a case of digging up and replacing the piping. SSE engaged with NuFlow to do relining on the pipes. A particular element of this challenge was that the sewer systems are located between the Post Office and the High Court, where it runs directly underneath the entrance used by the judges and alleged criminals. It would therefore have been impossible to excavate and install a new sewer, as this would have posed a considerable risk for the High Court building in terms of security. PA Information by Afhco, Sebenza Sanitary Engineers, and South African History Online. www.plumbingafrica.co.za 41 PROJECT DETAILS AND PROFESSIONALS Project name Jeppe Street Post Office Owner Afhco Developer Afhco Architect / designer Sprunt Project manager DDT Project Management Consulting engineers Contractors Electrical Electric Storm Wet services Sebenza Sanitary Engineers Civil TG Harrison Main building DDT Construction Wet services Sebenza Sanitary Engineers Electrical Electric Storm Product Supplier Mepla Geberit HDPE drainage Pluvia Hot water vessels and heat pumps Sirac Pumps DAB Pumps Sanitaryware and taps Plumblink March 2019 Volume 25 I Number 1