Plumbing Africa June 2017 | Page 30

28 Project 1 2 3 4 1. 2. 3. 4. Clear CAB piping was used so you can see what the water is doing inside. The pumps and water tanks used to run the Hydraulic Tower. Some of the 11 numbered scenarios set up on the tower. Various Geberit toilets set up on the tower so people can see how they work. “The Hydraulic Tower challenges the status quo. No architect, engineer, or plumber can visit this and not appreciate the significance of plumbing, water, and water flow.” June 2017 Volume 23 I Number 4 www.plumbingafrica.co.za