28
Project
1
2
3
4
1.
2.
3.
4.
Clear CAB piping was used so you can see what
the water is doing inside.
The pumps and water tanks used to run the
Hydraulic Tower.
Some of the 11 numbered scenarios set up on the
tower.
Various Geberit toilets set up on the tower so
people can see how they work.
“The Hydraulic Tower challenges
the status quo. No architect,
engineer, or plumber can visit
this and not appreciate the
significance of plumbing, water,
and water flow.”
June 2017 Volume 23 I Number 4
www.plumbingafrica.co.za