Plumbing Africa July 2023 | Page 30

30 PROJECT
Main sewerage pipe that had to run undrer the gates to the garage . Two non return valves .
system , played a pivotal role in pinpointing the exact positions for pipe installations . This innovative approach ensured a high level of accuracy , reducing the likelihood of errors and subsequent rework .
Benefiting from these innovations , the plumbing installation team was able to save time , increase productivity and maintain strict adherence to the project timeline . The precise alignment of pipes not only optimised the functionality of the plumbing system but also contributed to the aesthetic appeal of the finished apartments .
In addition to the meticulous pre-planning sessions , the success of the plumbing installation can be attributed to effective coordination with other subcontractors and the integration of innovative techniques . By addressing design issues in advance , the project team ensured a seamless implementation process . The utilisation of
templates and advanced technologies further enhanced precision , efficiency and adherence to the project timeline .
The plumbing installation is thus able to provide residents with essential amenities and ensure their comfort and convenience . It is through careful planning , collaboration and innovative approaches that this vital infrastructure contributes to the smooth functioning and longevity of modern living spaces .
On this occasion Plumbing Africa had sight of the Conditions of the Tender which we here reproduce to reinforce the requirements for projects of this nature and to do the plumbing correctly :
• All work to be carried out by accredited and registered plumbers .
• A plumbing certificate of compliance to be issued for the plumbing works .
• All water piping to be pressure tested as set out in the document .
• All materials used to be SANS approved .
• All materials installed to be from the same manufacturer throughout the project . If not possible the Wet Services Engineers to be notified in writing .
• All materials used in the project to be submitted for approval by the Wet Services Engineers prior to installation .
• Installation to comply with SANS 10400 P , SANS 10252 parts 1 & 2 .
Two hot water heat pumps .
The Consulting Engineer , Wills , Franklin Pretorius , had a very tight budget requiring many design / material / specification changes before and after the plumbing tender . Included was the tight coordination of the ducts and bathroom layouts to minimise pipework .
www . plumbingafrica . co . za @ plumbingonline @ plumbingonline @ PlumbingAfricaOnline July 2023 Volume 29 I Number 5