ASSOCIATIONS 11
 Follow the correct procedure to collect CPD points
 There has been some confusion regarding the claiming of CPD points and Plumbing Africa registration .
 Upon registration you will receive an email from Plumbing Africa which includes the following message :
 CPD CLAIM CERTIFICATE
 “ Please see below confirmation email confirming you have been registered to receive your Plumbing Africa print issue . Attach a screenshot of this email with your certificate to your Plumbers profile to claim your 5 CPD points .”
 This is then followed by a certificate which carries a contact ID 00000 ( top left corner ), all your details as provided on the Register to Receive form and confirms you are an active recipient of Plumbing Africa . See example on the right .
 The certificate is the ONLY MEANS OF CLAIMING CPD Points . The Register to Receive form is for Plumbing Africa ’ s own internal use as required by POPI Act and a copy sent to PIRB will NOT qualify to receive your CPD points .
 As regards the CPD Questionnaire , which is handled electronically mainly , continues as per normal . Complete all 11 issues and one will receive 2.75 points per annum .
 Visit www . plumbingafrica . co . za to register and complete your answers to the questions .
|  1 . |  How many tests does SANS 226 require | 
|  to be fully compliant ? | 
|  a . |  10 | 
|  b . |  9 | 
|  c . |  12 | 
|  2 . |  Who is responsible for renewing the | 
|  JASWIC listing ? | 
|  a . |  JASWIC | 
|  b . |  Manufacturer | 
|  c . |  Municipality | 
|  5 . |  How many products ranges does | 
|  Sunridge hold ? | 
|  a . |  2 300 | 
|  b . |  1 400 | 
|  c . |  1 200 | 
|  6 . |  What percentage of hot water | 
|  generation must be generated by nonelectric | 
|  means ? | 
|  a . |  40 % | 
|  b . |  30 % | 
|  c . |  50 % | 
 EXAMPLE ONLY
|  3 . |  In regulations who , most of the time , is | 
|  responsible for compliance on a project | 
|  during construction ? | 
|  a . |  Inspector | 
|  b . |  Owner | 
|  c . |  Manufacturer | 
|  4 . |  What will negate an insurance claim on | 
|  a project ? | 
|  a . |  No appropriate certificate | 
|  b . |  No certificate required | 
|  7 . |  What is the minimum threshold for | 
|  local content for solar water heater | 
|  components ? | 
|  a . |  60 % | 
|  b . |  70 % | 
|  c . |  80 % | 
|  8 . |  When was the building in the project | 
|  first built ? | 
|  a . |  1971 | 
|  b . |  1970 | 
|  c . |  1999 | 
 January 2023 Volume 28 I Number 11 www . plumbingafrica . co . za