ASSOCIATIONS 11
Follow the correct procedure to collect CPD points
There has been some confusion regarding the claiming of CPD points and Plumbing Africa registration .
Upon registration you will receive an email from Plumbing Africa which includes the following message :
CPD CLAIM CERTIFICATE
“ Please see below confirmation email confirming you have been registered to receive your Plumbing Africa print issue . Attach a screenshot of this email with your certificate to your Plumbers profile to claim your 5 CPD points .”
This is then followed by a certificate which carries a contact ID 00000 ( top left corner ), all your details as provided on the Register to Receive form and confirms you are an active recipient of Plumbing Africa . See example on the right .
The certificate is the ONLY MEANS OF CLAIMING CPD Points . The Register to Receive form is for Plumbing Africa ’ s own internal use as required by POPI Act and a copy sent to PIRB will NOT qualify to receive your CPD points .
As regards the CPD Questionnaire , which is handled electronically mainly , continues as per normal . Complete all 11 issues and one will receive 2.75 points per annum .
Visit www . plumbingafrica . co . za to register and complete your answers to the questions .
1 . |
How many tests does SANS 226 require |
to be fully compliant ? |
a . |
10 |
b . |
9 |
c . |
12 |
2 . |
Who is responsible for renewing the |
JASWIC listing ? |
a . |
JASWIC |
b . |
Manufacturer |
c . |
Municipality |
5 . |
How many products ranges does |
Sunridge hold ? |
a . |
2 300 |
b . |
1 400 |
c . |
1 200 |
6 . |
What percentage of hot water |
generation must be generated by nonelectric |
means ? |
a . |
40 % |
b . |
30 % |
c . |
50 % |
EXAMPLE ONLY
3 . |
In regulations who , most of the time , is |
responsible for compliance on a project |
during construction ? |
a . |
Inspector |
b . |
Owner |
c . |
Manufacturer |
4 . |
What will negate an insurance claim on |
a project ? |
a . |
No appropriate certificate |
b . |
No certificate required |
7 . |
What is the minimum threshold for |
local content for solar water heater |
components ? |
a . |
60 % |
b . |
70 % |
c . |
80 % |
8 . |
When was the building in the project |
first built ? |
a . |
1971 |
b . |
1970 |
c . |
1999 |
January 2023 Volume 28 I Number 11 www . plumbingafrica . co . za