Plumbing Africa January 2023 | Page 13

ASSOCIATIONS 11

Follow the correct procedure to collect CPD points

There has been some confusion regarding the claiming of CPD points and Plumbing Africa registration .
Upon registration you will receive an email from Plumbing Africa which includes the following message :
CPD CLAIM CERTIFICATE
“ Please see below confirmation email confirming you have been registered to receive your Plumbing Africa print issue . Attach a screenshot of this email with your certificate to your Plumbers profile to claim your 5 CPD points .”
This is then followed by a certificate which carries a contact ID 00000 ( top left corner ), all your details as provided on the Register to Receive form and confirms you are an active recipient of Plumbing Africa . See example on the right .
The certificate is the ONLY MEANS OF CLAIMING CPD Points . The Register to Receive form is for Plumbing Africa ’ s own internal use as required by POPI Act and a copy sent to PIRB will NOT qualify to receive your CPD points .
As regards the CPD Questionnaire , which is handled electronically mainly , continues as per normal . Complete all 11 issues and one will receive 2.75 points per annum .
Visit www . plumbingafrica . co . za to register and complete your answers to the questions .
1 .
How many tests does SANS 226 require
to be fully compliant ?
a .
10
b .
9
c .
12
2 .
Who is responsible for renewing the
JASWIC listing ?
a .
JASWIC
b .
Manufacturer
c .
Municipality
5 .
How many products ranges does
Sunridge hold ?
a .
2 300
b .
1 400
c .
1 200
6 .
What percentage of hot water
generation must be generated by nonelectric
means ?
a .
40 %
b .
30 %
c .
50 %

EXAMPLE ONLY

3 .
In regulations who , most of the time , is
responsible for compliance on a project
during construction ?
a .
Inspector
b .
Owner
c .
Manufacturer
4 .
What will negate an insurance claim on
a project ?
a .
No appropriate certificate
b .
No certificate required
7 .
What is the minimum threshold for
local content for solar water heater
components ?
a .
60 %
b .
70 %
c .
80 %
8 .
When was the building in the project
first built ?
a .
1971
b .
1970
c .
1999
January 2023 Volume 28 I Number 11 www . plumbingafrica . co . za