PROJECT
41
1
2
3
1.
2.
3.
Water reticulation for the machinery in the factory.
The eight 10 000ℓ JoJo tanks, booster pumps,
and air relief valves
Booster pumps installed on a mild steel assembly
with a canopy for protection.
Continued on page 43 >>
February 2018 Volume 23 I Number 12