Plumbing Africa February 2018 | Page 41

PROJECT 39 Massive backup water system for Nando’s factory Nando’s head office and factory in Midrand have a fully integrated 240 000ℓ backup water system that ensures ongoing production in the event of a water cut. Continued on page 40 >> www.plumbingafrica.co.za February 2018 Volume 23 I Number 12