Plumbing Africa August 2019 | Page 49

FEATURES 47 “Mines utilise extremely large heat pumps due to the demand for substantial volumes of hot water in their staff shower- houses.” Large heat pump located at Sun City. an existing geyser, it can be retrofitted to accommodate a heat pump. Although the savings on monthly electricity mean the residential pay-back period may be 18 to 26 months, the retail market tends to find this too long. Furthermore, it requires annual maintenance which adds perhaps another month a year to the pay-back. With Eskom’s rebate programme that had temporarily reduced. Performance criteria “The most important effect of the performance of a heat pump is the planning and design of a heat pump system,” says Sascha Altmann, managing director: Stiebel Eltron Southern Africa. “In a proper heat pump plan, you have to consider two very important facts: the input- and the August 2019 Volume 25 I Number 6 output-parameter. The input parameter consists, for example, of the ambient conditions that the system has to operate within, such as temperature and humidity, which have a great impact on performance. The output parameter describes the requirements of the specific project, like the amount of domestic hot water required; is space heating or space cooling required via the heat pump; or does the client want to heat his pool with the same device? Also the intelligence of the heat pump controller is important. You need an intelligent controller that runs the system in the most effective way. And last but not least, the installer has a significant influence on the performance. A heat pump is only as good as its installation: Pipe distances must be kept as short as possible; and the pipework needs a proper www.plumbingafrica.co.za