be replaced and repaired. Walls and ducts had to be opened and specialised camera equipment
used to inspect the pipes. Through gradual investigation, they figured out what infrastructure could
be used and what needed to be replaced. The investigation included rainwater downpipes, sewer
pipes, and water pipes.
The new plumbing installations at Castle Kyalami will complement the 26-year-old building’s
impressive architecture. Ultimately, the castle will be a combination of style, luxury, and quality
plumbing installations, with the potential to last the castle’s lifespan. PA
THE TEAM
Main contractor
Engineers
Project manager
Plumbing contractor
Aveng Grinaker-LTA
Aurecon
Origin
GDM Plumbing & Projects
LIST OF SUPPLIERS
Geberit
Geberit
Geberit
Geberit
Duravit
Kwikot
Kwikot
Grundfos
Grundfos
Grohe
Calcamite
View Tanks
DPI South Africa
Hot and cold-water pipework
HDPE drainage pipework
Toilet cisterns
Shower traps
Sanitaryware
Heat pumps
Geysers
Hydro-Multi-B-E 3 CR 15-5 booster pumps
CM5-6 circulation pumps
Tapware
BM10 – BM4 septic tanks
Flygt 3068 – 50Hz septic pump
PVC drainage pipework