Plant Equipment and Hire February 2019 | Page 29

NEW EQUIPMENT At an output capacity of 200 tonnes per hour, the plant comes in just two units. The iNOVA 2000 is the first fully mobile asphalt plant in South Africa. of 200 tonnes per hour (t/h) — that, one chassis; and 150t/h plant on “Location affects output in that it and its compact build: it comes in two chassis. And then there’s the decreases with the increase in height just two units. This is in stark contrast iNOVA 2000, which is the 200t/h, above sea level. Here in Johannesburg, to some of the existing plants in the two chassis plant,” says Kukard. He for example, there is a reduced output stable, which come in six units but only maintains that there are two main when compared with, say, a plant at a produce 120t/h. deciding factor requirements for the site in a coastal area. The loss in output size of the plant: the client’s output is roughly 10% for every 1 000m above sales manager, explains that the new requirements based on average sea level.” iNOVA range has varying capacities production per day, and the other for those customers requiring greater critical factor is location — where the have benefitted tremendously from or lesser output volume. “There are plant will be working. high production capacity and the Waylon Kukard, Wirtgen Group four plants in the range: 100t/h plant on one chassis; the 150t/h plant on www.plantonline.co.za Heinrich Schulenburg, Wirtgen Group managing director, elaborates, Kemp and his team say that they resulting seamless operations that the iNOVA provides. FEBRUARY 2019 27