Pinal County JLUS Final Report | Page 164

  ROADWAY CAPACITY (RC) ISSUES  RC‐1:  Access to Florence Military Reservation from State Route 79 is not separated  from travel lanes.  Location:    Florence Military Reservation  State Route 79 is the main thoroughfare between the Town of Florence and US 60  and has a speed limit of 65 miles per hour.  The lack of turn lanes for accessing  Florence Military Reservation from State Route 79 results in potential conflicts and  safety concerns between military vehicles entering or leaving the installation and  civilian traffic using State Route 79.  Additionally, there are no signs to alert civilian  drivers that military traffic may be entering or exiting the highway.  RECOMMENDED STRATEGIES  RC‐1A: Integrate turn lanes and / or traffic signal control to improve access to  Florence Military Reservation.  The AZARNG should coordinate with the Arizona Department of Transportation  (ADOT) to address safety concerns and discuss options that could be implemented to  address them, such as a turn lane or signalized traffic control along SR 79 at the  entrance to Florence Military Reservation.  If these are considered feasible, AZARNG  should develop the initial layout plan options for a turn lane or a traffic signal to  control the entrance to Florence Military Reservation and improve safety.  These  options will then be presented to ADOT for review and consideration.  The AZARNG  will be responsible for funding the option that is decided upon.  Strategy Type:  Timeframe:  Primary Party:  AZARNG    Partner:   ADOT   Geographic Area:  N/A      RC‐1B: Conduct a traffic study.  Primary Party:  The AZARNG should procure a consultant to conduct a traffic study and assess high  traffic times resulting from AZARNG vehicles and operations.  The AZARNG and their  consultant should work with the ADOT to collect relevant information and data to  support the study.  A feasibility study should be conducted first to determine if a full  study is needed and to identify funding sources.   Strategy Type:  Timeframe:  AZARNG    Partner:   ADOT  Geographic Area:  N/A      RC‐1C: Prepare a traffic modeling study for the areas immediately surrounding  Florence Military Reservation.  Primary Party:  The AZARNG should procure a consultant to prepare a comprehensive traffic  modeling study for the areas immediately around AZARNG sites to assess roadway  capacity levels for egress and ingress to the various AZARNG locations.  The AZARNG  and their consultant should work with the ADOT to collect relevant information and  data to support the study.      Partner:   ADOT  Strategy Type:  Timeframe:   AZARNG  Geographic Area:  N/A    146   Implementation Plan