Pinal County JLUS Background Report | Page 286

  Figure 5‐16  Proposed Union Pacific Railroad Switchyard    Source: Pinal County Economic Development, http://www.pinalcountyaz.gov.  According to Pinal County, the project is in the proposal stage and has not received any  of the required approvals to proceed any further.  The status the project is considered  long‐term and has been set aside by UP for the immediate future.  The 950‐acre site would involve the separation and classification of boxcars that had  been loaded on to trains at the port of Long Beach in California along with the assembly  of the trains to move the railcars containing materials and products to their intended  destination.  In addition, the new railroad yard would improve railroad operational  efficiency by optimizing railcar logistics.  Tucson and Flagstaff are major railroad centers  of operation with Phoenix situated in between.  Currently, after unloading materials,  empty railcars are moved from Phoenix back to Tucson and then sent on to other  locations from there.  Operations at the new railroad yard would reduce the number of  empty railcars travelling between the Arizona locations.    Activities at the classification / switching yard would include the unloading and reloading  of hazardous cargo, which could result in incidents if accidents were to occur.  Although  these events are highly unlikely to occur, incidents could include fires, explosions or  similar events that can occur when dealing with hazardous cargo.  In the event hazardous  cargo incidents were to occur, it would have the potential to impact helicopter  operations flying from SBAH and Picacho Peak Stagefield, depending on the size and  extent of the incident.  Impacts could include smoke plumes or hazardous material  emissions in the air.  Pilots would have to avoid flying over or near the hazardous cargo  incident location until there was no longer any potential impacts to safe flight operations.   This could impact AZARNG training times and hinder completion of operations necessary  5-94 Compatibility Assessment