PECM Issue 76 2025 | Page 88

MACHINING & MACHINERY
MACHINING & MACHINERY

www. sykesmachines. com

In addition to rebuilding and retrofitting W. E. Sykes gear machine, we have spare capacity to remanufacture other makes of gear cutting machines.

We can rebuild ANY machines from:- Lorenz, Liebherr, Pfauter, Gleason, Hurth, WMW and Matrix Thread Grinders.
Totalkare’ s ergonomic positioners are single or double column devices that enable the lifting and rotation of a product during welding and assembly operations.

We offer generous part exchange, and are always looking for surplus machines.

With overall capacity from 2,000- 90,000kg to suit, they are both compact and flexible.

Contact Mr. Chan S Chowdhry. W. E. Sykes( GB) Ltd

GET A QUOTE: T: 0121 585 2724 / WWW. TOTALKARE. CO. UK

T: + 44( 0) 7 860345343 E: chan @ farrellengineering. com

MANUFACTURER OF HIGH QUALITY

ANTI VIBRATION PRODUCTS

New premises supports continued growth of control panel manufacture
WIDE RANGE OF STOCK AVAILABLE FOR NEXT DAY DELIVERY

01282 878200 sales @ fibet. co. uk | www. fibet. co. uk

Fibet Rubber Bonding( UK) Ltd Unit 9 Dale Mill, Hallam Road, Nelson, Lancashire, BB9 8AN
88 PECM Issue 76 activities carried out by the company, such as the design, manufacture, and testing of
INDUS Engineering Services is proud to offer a wide range of custom HAKUFLUID control panels,- automation systems and
– OIL-FREE COOLING LUBRICANTS special purpose machinery.
After working on major control and automation Precision projects Performance: for several Delivers of the south consistent’ s performance & leading brands cleanliness, the company in machining with a safer, has recently acquired a new eco-friendly EHS profile. premises with the aim of
# AdvancedMetalworking increasing production capacity of bespoke and sub-contract, control panel info manufacture. uk @ kluthe.. com The new premises + 44( will 0) 330 also 175 9970requirements. allow us to support the wider range of engineering HARMONY IN CHEMISTRY special purpose machinery. Also, to further our goals to reduce our carbon foot print we will be installing a high efficiency solar PV array in the coming months. For more information on the services that are available please do not hesitate to contact and we will be happy to discuss your project needs and
www. indusengineering. co. uk www. kluthe. com
Issue 72 PECM 79