SAFETY & CONTROL
PRESSURE RELIEF
REMBE
Rupture disc for applications with strict hygiene requirements
There are two main challenges for aseptic
processes: firstly, sterility is not guaranteed
with DIN or EN flanges, and secondly,
existing system parts must be modified
to integrate these flanges, which create
undesirable dead spaces.
Cutting pipes, attaching new flange
connections, flanging pipe sections with
an integrated rupture disc and correcting
suspensions if necessary - the to-do list of
fitters is extensive.
The REMBE rupture disc KUB clean
with sanitary gaskets provides help. If a
process is to be secured (retrospectively),
an existing tri-clamp connection can be
replaced by a KUB clean rupture disc
without modifying the existing pipework.
Fitters no longer need to do the tasks
The integrated gasket in
the rupture disc assembly
is also particularly robust
and corrosion-resistant.
described above. The KUB clean enables
fast, simple and reliable process safety. The
secret lies in the combination of a highquality
reverse acting rupture disc and a
special gasket, which is characterized by
durability and resistance. The integrated
gasket in the rupture disc assembly is also
particularly robust and corrosion-resistant.
If necessary, the tri-clamp connection
can be opened and the rupture disc and
gasket can be easily removed.
The KUB clean is unique in the fact that it
can be supplied with integrated signalling
to provide constant monitoring of the
rupture disc and reliable notification
of disc burst when connected into a
process control system - all from one
installation point, and as a single device!
Fulfilling the hygienic standards and FDA
requirements, the KUB clean with its
integrated signalling is quick and simple
to install. Providing a completely leak-tight
seal, the KUB clean with its integrated
signalling offers the most reliable burst
notification under stringent, hygienic
operating conditions.
Rupture disc KUB clean with
integrated signalling
Rupture disc KUB clean – for applications
with strict hygiene requirements
For further information, please visit www.rembe.com
42 PECM Issue 45