PECM Issue 26 2017 | Page 9

For further information: Islebest Limited Email: [email protected] Tel: +44 (0) 1582 492 949 Fax: +44 (0) 1582 493 411 4 STEPS TO QUALITY MANUFACTURING 1 3 SOLID DESIGN We believe that successful projects are always based on solid designs, so we will endeavour to ensure that every project we accept is fi rst designed, reviewed and approved before any manufacturing work is undertaken. INNOVATIVE TECHNIQUES We regularly invest in state of the art equipment, which ensures that both our machinery and staff are equipped to produce industry-leading results. We strive to maintain a level of innovation in all we do, and always love a new challenge. 2 4 CREATIVE DEVELOPMENT Creative development is pro-active and key to providing a successful project outcome. We put our faith in prototypes, samples and test runs to ensure that the fi nished article will meet your exacting standards. DEDICATED PRODUCTION Our 32,000 square feet site in Sundon Park houses all our manufacturing, as well as our design and development offi ces. This helps us to stay in full control of our quality process and on time deliveries. We off er the fullest range of welding capabilities, from MIG, ARC and high standard TIG welding, delivered to you in part or fi nished and fully assembled to suit your requirements. Our design capabilities are second to none, compromising our innovative 3D modelling software which allows us to create detailed plans for your review before any metalwork is undertaken. THE VERY FIRST TruMatic 1000 Fiber from TRUMPF IN THE UK