PECM Issue 22 2016 | Page 87

Standard features of A&J Fabtech suction the unique site geometry and a total of 32 two removable working platforms which lift scrapers include an automatic greasing scum removal systems were installed on provided safe access to the working area system for the slew-ring bearing; loss of the submerged rotating truss structures, – as well as reducing scaffold costs and motion detection, over-torque protection thus concentrating surface scum towards speeding up time to completion. As the and loss of suction or blockage detection new dipping scumboxes and outlet pipes. final detail of the project A&J Fabtech to protect the core scraper functions. A&J Fabtech usually delivers its scrapers with all on-bridge equipment pre-wired to reduce the need for on-site work. As with all of A&J Fabtech equipment, suction lift scrapers can be adapted to suit the specific requirements of the site by the use of bespoke designs or the addition of optional features such as electrical control equipment, launder cleaning systems, scum control systems and in-tank baffles and diffusers. Another element of the Crossness project was the automation of the aeration lanes launder trough through the addition of two activated sludge tank flow-regulating outlet launderers to the existing sixteen activated sludge plant aeration lanes. The launders selfregulate using electric actuators to match the outgoing flow rate. fabricated six galvanised motor control centre support frameworks. These were located above cable pits at various locations associated with large motor control centres or LV/HV (low voltage/high voltage) power distribution panels. Since the completion of the project A&J Fabtech has been presented with the Tamesis "Shining Contractor Award" and has received a Letter of Commendation However, a risk assessment showed that from Thames Water for the development A&J Fabtech was also able to provide a the need to access the aeration lane floor and implementation of improved working bespoke retrofit scum removal solution during the construction phase would practices that also delivered tangible cost to solve issues that were specific to the have major health and safety implications savings. site's existing final settlement tank fixed for both the scaffold teams and site full-bridge scrapers. Its proven scum engineering team. To overcome these removal technology was adapted to meet A&J Fabtech designed and manufactured www.ajfabtech.com A&J Fabtech has been commended for developing a new safer, quicker and lower cost method of installing rotating full-bridge suction lift scrapers, a procedure it used when working on Thames Water's London Tideway Improvement scheme.