PECM Issue 19 2016 | Page 126

Load Cells Monitor Weight As Cranes Operates On Temporary Shoring Columns orty 10-ton wireless compression load cells from Straightpoint monitor forces on temporary shoring columns used to support two tower cranes during the Century City Mall project on Santa Monica Blvd., Los Angeles, California. F Two cranes from rental company Mr. Crane, supplied by Morrow Equipment Co., are supported by the existing columns and shoring posts, as load cells calcu-late total mass and center of gravity of the cranes and subsequent lifted loads. Both cranes are located on an existing, two-floor, underground parking gar-age. A Liebherr 630 EC-H 20 Litronic is stationary, while a Liebherr 542 HC-L18 Litronic operates on rails and traverses the length of the project in stages. The cranes used to erect them on the garage were a Liebherr LR1300 crawler crane and a Liebherr LTM1400-7.1 hydraulic truck crane. There is a third tower crane—another 630—on a standard foundation on the ‘Macy’s side’ of the project. Each crane is supported from the deck down to the final slab of the structure using jackscrew shoring posts on both floors of the car park, positioned at each of the four corners of the stationary crane, and along the pathway for the traveling crane.