Peace & Stability Journal Volume 5, Issue 3 | Page 23

reimbursements for moving units in mid-operation. If such mid-operation movements are required, SETM is well suited with temporarily rented industrial moving equipment and trucks. Overall, the UN PKO COE operational policy requirements for procuring the amount of essential electrical generation needed per manned unit is conducive to accepting, and does not prevent the integration of, SETM; as long as the SETM, with operational capability and sufficient backup capacity to main camps and medical facilities around the clock, is provided. As is often the case with the use of SETM in field environments, the SETM battery storage by default, serves as the back up to the system. If the batteries no longer hold a charge, smaller, Financing and Procurement/Logistics Although UN members’ financial contributions are equal as they are proportionate, internal UN political capital is considered via a more laissez faire system. When comparing the regular UN budget to the UN Peacekeeping budget, the UN DPKO manages more funds (est. USD7.5B36) than the UNSG manages (est. USD2.6B37). Financing for UN PKO is via established funds for reimbursements to nations providing peacekeeping logistical and sustainment aspects. UN programs administering UN PKO equipment, services, and training are funded in the form of the Contingency Owned Equipment (COE) system, the UN Procurement Division (UNPD), and its United Nations Global Marketplace (UNGM) online vendor registration system. The UNPD website describes COE and UNPD, as follows: The UNPD conducts procurement for the UN Headquarters in New York, Peacekeeping/Political Missions, Tribunals and Commissions. Selected offices away from Headquarters do have delegated procurement authority to carry out their own procurement up to established financial limits. The UNPD generally conducts purchases beyond these limits and for global acquisition projects.38 The details of the finance and procurement processes are located online wherein the UNPD system is made more transparent for LDCs. Moreover, the UNPD might seize the opportunity to work with the UNSG to establish a SETM procurement and distribution fund as a project, which is language used in UNPD policy on its website. and more fuel efficient than traditional, generators are used to recharge those SETM batteries.35 For example, at night if the batteries are depleted late into the evening after the sun charged them during the day, then a more efficient generator can charge the batteries. After financing is approved, sustaining procurement and logistics for SETM in UN PKO is more easily done with traditional sea/air/ground shipments of containers. SETM shipments are of chemically stable and inert materiel; or more simply stated, sand-based plastics, steel, and batteries. The costs of SETM shipments are minimal and a fraction in comparison to regularly repeating fossil fuel shipments. Should there be UN project engineering questions; an example of how procurement and installation might take place can be seen in the U.S. DoD’s Rapid Innovation Fund (RIF) procurement concept, recently reported by the Wall Street Journal.39 “RIF provides a collaborative vehicle for small businesses to provide the department with innovative technologies that can be rapidly inserted into acquisition programs that meet specific defense needs.”40 The U.S. Army Corps of Engineers was the group awarded RIF so UN planners could specifically look to them for program guidance. Moreover, the UN can be sure the U.S. Department of Defense has been considering SETM use in the operational setting. 21