How we are managing the key operational risks - Sewerage
• A sewer main collapse
Risk
Roma ’ s sewerage network consists predominantly of reinforced concrete and asbestos cement with the expected life now exceeded ( pipes over 50 years old ).
The majority of the networks were constructed in the 50s and 60s . Following a significant investment in relining , and CCTV to obtain good quality information on condition , there are now 6.9kms of Roma ’ s gravity sewer pipes that have been classified in a Condition 5 state . This means that the pipes are at the point of failure and need to be addressed urgently .
If the sewer deteriorates beyond repair ( before relining can occur ) pipes will need to be replaced by open excavation . This is estimated to be close to double the cost of relining .
Actions
• The condition of the sewers are closely monitored and documented ;
• Sewers are condition rated from 1-5 with 5 being close to failure ;
• A program is in place to address all sewers with a condition of 5 as soon as possible ;
• Closed circuit television ( CCTV ) programs are implemented each year to gather data on the condition of sewers ;
• From the CCTV reports the condition of the sewers are updated to provide the most accurate data possible ;
• Sewers are renewed through relining , which is cost effective and less disruptive to customers .
Council previously committed a $ 3 million investment financed by a loan to address a large proportion of the relining works . Council also advocated to the Queensland Government for assistance with the balance of the funding needed ($ 1.6 million ), however was unsuccessful . We aim to carry out $ 500,000 + relining works each year .
Our plans for 2021 / 22
• Failure of a sewage pump station • The condition of the pump stations are closely monitored and documented ;
• Redundancy is built in through the installation of more than one pump at each station ;
• Pumps and pump stations are routinely serviced each year and any deficiencies addressed as soon as practical ;
• The installation of SCADA at each site will provide early warning of issues ;
• Generators are installed to provide backup power in the event of an electrical failure .
• Treatment failure resulting in breach of conditions can result in environmental damage and fines
• Suitably qualified / certified staff are operating the systems ;
• Personnel trained and competent for operations and maintenance tasks ;
• Records of training maintained ;
• Procedures are in place to ensure the correct operation of the systems ;
• Regular monitoring of results and acting with urgency when results are not normal ;
• Trade waste arrangements to control quality and volume of industrial wastes ;
• Controls on allowable discharges at the treatment plants ;
• Regular maintenance of the ponds such as de-sludging .
New initiatives in 2021 / 22
New or upgraded assets How we are reducing operational risks in 2021 / 22
Upgrade Mitchell and Surat sewage pump stations
Sewage pump station 1 Roma additional capacity / storage
Install flow meters at sewage pump stations - regional
Replace pumps Amby and Mungallala sewage pump stations
Replace pumps at Sewerage Pump Station ( SPS ) 6 , 7 and 8 , Roma
These works are required to provide safe access to the sewage pump stations .
Providing additional capacity at the pump station will reduce the current overflow issues that occur during significant rain events .
The installation of flow meters will provide better data to monitor the pump station operations .
The replacement of the pumps will provide better quality pumps and reliable operation .
Replacement of old pumps .
Relining works , Roma and Mitchell |
Relining of sewer mains prevents possible failures which are costly and disruptive to fix . |
Replace sewer mains , Surat |
Replacement of the sewer main will prevent a failure occuring i . e . collapsing or |
restriction of flow . |
27