Our House e-newsletter January 2012 | Page 22

by Georgia Mjartan, Executive Director The Our House Education Building underwent a major renovation as 2011 came to a close.   Broken doors that didn’t close were replaced with new ones that have windows and safety locks. There are no more dark hallways where children can’t be seen by staff, and our classrooms stay warm and draft-free in the winter months. A new hallway connects the Our Club after-school space with the rest of the building. Where children used to have to walk outside to get to the restroom, they now have an indoor route. Spaces that used to be dark now have natural light streaming through new windows. Speech and occupational therapists no longer meet with children in the middle of the kitchen. They have a designated, private meeting room. Adult students test in a quiet space. Staff offices are separate from children’s play areas. Thanks to PDC Construction and Jaime Gardner at CIRB Services for doing such a fabulous job on this project and completing it in record time (3 weeks), allowing us to get our kids’ space back in time for the winter break. before after