Generator solutions
A Diesel Generator with Automatic Mains Fail (AMF) changeover switch is the only practical
and cost effective solution for long term back-up of power during an extended power outage.
Standby Generators working in tandem with Uninterruptible Power Supplies (UPS) are
commonly used in Buildings, Hospitals, Data Centres and Financial and Banking Centres as
power protection for all mission critical systems.
NSSE provides Diesel Generator systems ranging from 10kVA – 6mVA.
These are usually supplied with standard EEC acoustic and weatherproof canopies but if
required we can supply open sets.
Sizing of a generator is critical, particularly if used in conjunction
with a UPS. NSSE, with many years of experience in the
emergency power Industry, is pleased to help in specifying your
requirement and the consultancy service is completely free of
charge. NSSE offer to carry out a site survey for both the hardware
and the electrical installation and will project manage your
installation from start to finish.
Emergency Call – Generator Hire
NSSE’s Emergency Call is a nationwide emergency callout generator network with guaranteed
response to contracted sites 24/7/365. Our national average response time is 100 minutes!
The most cost effective 24/7/365 guaranteed solution to prolonged power cuts nationwide, providing
peace-of-mind for any operation that cares about business continuity and guaranteed service levels.
Site Registration involves installation of a one off ‘plug-and-play’ manual generator connection and
changeover system. An Emergency Call contract is then issued for a fixed monthly fee.
Emergency callouts to unscheduled power cuts are unlimited and included free of charge.
The NSSE 24/7/365 network control room manages all callouts, co-ordinating the operation from start
to finish, including delivery, connection, refuelling, and collection of the generator.
Our Emergency Call solution costs a subscription fee of
£149.00 per month (ex VAT) for a 36 month initial term.
*This subscription fee includes the electrical installation of the switch
and external socket point for the generator and cabling.
*Installation assumes up to 200a and within 10m of electricity supply
(may be subject to site survey).