NHP Newsroom AUTUMN 2019 (NZ) | Page 9

The above images showcase the before and after installation of the SVG unit. Before turning on the SVG unit, the power factor (green line) is shown to vary down to 0.8 around 4pm on August 22, 2018, the moment the SVG unit is switched on the Power Factor improves instantly and remains at target power factor under all load conditions. (This is data captured via InfoSyte – this has not been manipulated). 9