NHP News Room Spring 2019 News Room FINAL | Page 9

“RMS Manufacturing only manufacturers switchboards using quality electrical switchgear and components from the industry’s most reputable suppliers, like that of NHP,” commented RMS Manufacturing’s Managing Director, Mina Shehata. A major component of the project was the installation of the CUBIC Switchboard, which is fully modular and has a smart design that is fast and easy to assemble. Designed to meet strict safety demands, the CUBIC switchboard system is also characterised by a high degree of operational dependability and safety, has type testing certification up to 7000A at 120kA and is designed and built by accredited switchboard builders only. “CUBIC’s quick delivery of components and unique assembly method allows for speedy and fully modular construction, which was a primary consideration based on the tight deadlines for the project,” said Vinh Tang, from NHP’s Automation Business Development. The Carlo Gavazzi WM30 energy management smart modular power analyser was also specified to ensure the ongoing availability of power capacity monitoring at the Campbellfield factory. The multi-function meter provides exceptional energy management data to improve risk management, equipment reliability and productivity while reducing greenhouse gas emissions and maintenance costs. NHP’s range of Terasaki circuit breakers completed the solution, providing quality protection of the electrical installation against over currents and short circuits. NHP and RMS delivered the project with an extremely fast turnaround time while ensuring all aspects met Nestle’s standardised requirements. “The NHP and RMS teams performed above our expectations, with the turnaround time less than half that of our previous projects and thanks to their experience and expertise, we were manufacturing our medicated lozenge range in Campbellfield on schedule,” said Nestle spokesperson In this project, NHP and RMS worked seamlessly to ensure the components aligned with the requirements and no downtime or decreases in production occurred. The standard design can now be applied to Nestle sites all over Australia, and the increased power capacity is energising the relocated production. 9