_____________________________________________________________________________________________________________ Viridor
temperatures are needed to break down pollutants in the waste. Any resulting emissions are treated to meet the stringent European Industrial Emissions Directive, with the process monitored carefully by relevant regulatory authorities.
Following the commencement of operations at the new Westfield ERF in Fife, further expansion is underway. Construction work at the Thameside ERF at Tilbury Docks is already underway, with a view to reaching commercial operation in 2028, and once operational, it will divert a further 350,000 tons of waste from landfill per year, generating enough energy to power the equivalent of almost 100,000 homes. The electricity generated will be fed into the National Grid and linked via underground cables to the Tilbury substation on the east side of the Docks.
Comprehensive refractory installation services Specialists in monolithic refractory systems, gunning, pumping, vibro-casting, bricklaying, tiling and ramming.
Design and engineering services Refractory lining design, heat-flow calculation, thermal expansion analysis, dry-out supervision, commissioning guidance, and tailored material recommendations.

REFRACTORY ENGINEERS & CONTRACTORS

Inspection, supervision and project management Covering site inspections, recommendations, supervision site management, coordination, risk-assessments, method statements, daily planning, and safety audits.
Expertise across multiple heavy-process industries Including Energy from Waste, Biomass, Petrochemical and Chemical sectors.
Trusted accreditations and UK-based operations since 2021— fully certified to ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, Achilles Registered. www. lisl. co. uk info @ lisl. co. uk