Networks Europe Jul-Aug 2018 | Page 27

CABLING be in the 100’s. 1U 48 port patch panel frames are now available, with copper looms manufactured in 6 and 12 cable looms giving even more concentration in a smaller rack space. Another addition can be employed; an out of rack patching enclosure mounted above each rack. Again, it’s all about flexibility with all connections outside of the rack, cables looms can be installed before the rack arrives. Adding and moving cable looms becomes a less risky operation. MTP/MPO fibre is now commonplace pre-terminated, again this has allowed maximum connections in a smaller form patch frame 96 cores in 1U with the ability to break out via interface cassettes, just by swapping out cassettes there’s future-proofing which could reach up to 400Gps. By their nature data centres are highly secure, they need the cabling installed as quickly and safely as possible with minimal disruption and mess. There’s still an element of on-site testing required by the loom manufacturers – normally two tests per cable loom – to ensure the looms have been installed correctly with no undue twists or kinks. Also to check that there’s no undue stress on the termination cassettes leading to cores becoming dislodged; this testing is required for the fibre terminations for the same reasons. Pre-terminated cable looms can be moved with no mess or disruption and re-used, older fixed systems have to be cut out and removed. n SECOM Networks Ltd Specialised Electrical & Communications Design and Cabling for the IT Industry Secom Networks advise, design, install and project manager complete pre-terminated cabling systems for DC’s and office new and refurbishment projects. We specialise in rack building, server installation, advise on power and cable management, and labelling. Labelling is often forgotten until you have to find something, therefore it is best to label everything. We can build your rack on or off site fitted with power, electronic locks, and cable management. We have the latest Fluke diagnostic and cable analysers, in house CAD, Visio resource as well as 3D Printing resource. We design and manufacture bracketry for all those awkward components that need to be mounted somehow, somewhere. On completion of every Project you will receive a comprehensive Oper ation and Maintenance manual, complete with cabling topologies. • Rack tidy • Rack audits • Patching audits • Retrofit cable management • First Aid trained engineers • Safe Contractor accredited [email protected] • 0845 450 7494 • www.secomnetworksltd.co.uk Designed, manufactured and supported by a UK company www.networkseuropemagazine.com 27