PROJECT: MacFarlane Place, Television Centre, West London
CLIENT: Stanhope
MAIN CONTRACTOR: Kier LANDSCAPE ARCHITECT: Gillespies SUB-CONTRACTORS: Skidmores of Hertford & LJH Contractors
START & FINISH: April – August 2024
MATERIALS: Yorkstone( UK), European Granite mix, Paveit Bedding & Jointing
PROJECT OUTLINE
The new development provides 142 mixed tenure residential units and also includes 2,821sq ft of flexible commercial space at ground floor level and a landscaped communal garden.
DEVELOP
ParCa Ltd worked with the nominated subcontractor Skidmore’ s & LJH and for the hard landscaping it was intended for the granite to match into an existing phase, which had used Chinese granite. The project also had Yorkstone and all the paving was to be laid on a BS 7533 bedding & Jointing system.
Due to the commencement of the Gaza war it was decided to investigate granite from Europe and working with our partnered supplier, we proposed a selection of granites which would ease the pressure on the timeline for the supply of the granite.
DETAIL
We began working with the sub-contractors, landscape architect and the main contractor to find a suitable blend and mix of colours from Europe. Initially 10 granite colours ere in the selection process and we provided cost comparisons and technical information for each type to aid in the selection process, once the final selection was made we provided small sample panels of the materials, so we could finalise the blend.
included all natural stone materials, so even the Yorkstone being supplied from the UK.
For this project we delivered the Paveit range of bedding & jointing directly from the manufacturing plant to site in full loads of bulk bags of bedding and small poly bags of primer and grout.
The colours used within the granite blend work very well with the tones of the surrounding building and the Yorkstone laid on the surrounding footpaths.
ParCa was also able to use our customer friendly calculator to work out the quantities of bedding, primer and grout for the project, and this was incorporated into the final system.
DELIVER
Once manufacturing was underway ParCa produced an order tracker, which gives an in depth look at the current volumes produced and forecasted shipping dates, which enables the site team to plan labour and space on site. The tracker
Due to enforced road closures the site could only take small loads. We engaged a partnered haulier and used an urban short trailer, this has the same load capacity as a full artic, but as the trailer can be shortened, it can handle larger loads than rigids and still access tighter spaces, so we kept vehicle movements to a minimum and by storing materials in our yard prior to delivery meant we had material on hand when required.
SUMMARY & SHARE
The project was completed within the necessary timescale required, and over 1400m2 of paving was supplied along with 200 tons of bedding and jointing.
The attention to detail from the installation team means the overall quality of the installation is to a very high standard, and the project was supplied without a single-issue regarding quality or tolerances on any of the stone materials. The intention of this analysis is to showcase the work carried out and support given by ParCa Ltd to the project, it in no way encompasses every person or organization that may have been involved, but we give recognition to the physical parties we engaged with. The pictures contained have been taken by ParCa Ltd. For more information, telephone: 03301 335 334 / 07389 889892 or email: technical @ parca-ltd. co. uk.