Feature a stone stability frame saved money by omitting the core structures and removing the need for decorative cladding while addressed the context. It was also a significant carbon saving over building a core and brick façade.
Frame connection during installation
The stone elements were tested for fire. The connections and joints details were load tested in the factory. The building was subject to a BSR review and has passed the structural element.
As well as a innovative primary structural frame the building also has a solid stone lift shaft. The 13 storey lift shaft was pre assembled from storey high slabs single granite slabs 100mm thick in floor high units and delivered to site and erected in 2 days. This method of constructing a lift shaft has never been used before. This points the way to eradicating high carbon concrete cores from other building as well as the use of solid unreinforced stone as a more durable alternative to precast slabs.
This points the way to eradicating high carbon concrete cores from other building as well as the use of solid unreinforced stone as a more durable alternative to precast slabs.
Lift shaft modules being assembled
This project, as well as an interesting building in its own right, is more importantly a really meaningful advance in the development of a new way of building. It demonstrates that medium rise buildings are feasible in load bearing stone. It shows that main contractors can become comfortable and competent with stone.
Using this as an example Webb Yates are currently working on the development of a number high-rise projects where a stone façade replacing a structural core may deliver significant cost savings over the traditional approach thus opening the door to a new era of lower carbon Highrise buildings using a natural material in an honest and expressive way.