Projeler/Projects: Addis Ababa
Taş işleme süreci / Stone process
KULE CEPHESİNDEKİ TAŞ BLOKLAR
ARALARINDA BÜYÜK AÇIKLIKLAR BIRAKACAK
ŞEKİLDE UYGULANDI.
THE LOCAL TRACHYTE STONE WAS CLAD ON THE
TOWER’S FAÇADE, LEAVING BIG GAPS BETWEEN THE
STONE BLOCKS.
MİMAR / ARCHITECT: BC Architects ve Adey Tadesse (ABBA Architects) iş birliği / BC Architects in
collaboration with Adey Tadesse of ABBA Architects
YER / LOCATION: Addis Ababa, Etiyopya / Ethiopia
YIL / YEAR: 2013
PROGRAM / PROGRAMME: Açık ve kapalı kamusal alanlar ile ofis katları / Open and close public
spaces and office floors
MALZEMELER / MATERIALS: Trachyte taşı, beton, cam / Trachyte stone, concrete, glass
ALAN / AREA: 10.000 m²
92 NATURA • EYLÜL - EKİM 2013 / SEPTEMBER - OCTOBER 2013
Cephe kesiti
Façade section