Construction—EMEA—Germany—Excavations
The tiebacks were installed using superposition
drilling. In some areas, there were up to 3 levels
of anchors crossing each other, which required
drilling tolerances of a maximum of 1°.
The tunnel structure will be concreted as a
trough structure in sections with floor slabs,
walls and corners until the end of 2016.
Afterwards, the excavation will be backfilled,
and the tracks on the surface will resume
operation.
Owner
Stadtwerke Augsburg Verkehrs-
GmbH, Germany
Contractor
Stump Spezialtiefbau GmbH
(as a Joint Venture), Germany
Engineering
Engineering association MDA Hbf,
consisting of K+S Ingenieur-Consult
GmbH & Co. KG and SSF Ingenieure
AG, both Germany
DSI Unit
DYWIDAG-Systems International
GmbH, BU Geotechnics, Germany
DSI Scope
Production, supply
DYWIDAG Products
182 4-strand DYWIDAG Anchors,
140 5-strand DYWIDAG Anchors and
40 6-strand DYWIDAG Anchors